Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | 190ST ESTATE LLC NYC DOB building permits | 10 | Support of Excavation · FILE SOE IN CONJUNCTION WITH JOB#Q01319786 No product keyword matched | 5 | Oct 13, 2026 |
| B | MOSHOLU MONTEFIORE COMMUNITY CENTER NYC DOB building permits | 10 |
Sign · ILLUMINATED NON-ADVERTISING ACCESSORY SIGN ON EXISTING ENTRANCE MARQUEE - CHILD DEVELOPMENT CENTER OF MMCC. NO CHANGE OF USE, EGRESS OR OCCUPANCY. No product keyword matched |
| 1 |
| Oct 13, 2026 |
| B | B BUILDERS GROUP NYC DOB building permits | 10 | Construction Fence · installation of construction plywood fence. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc No product keyword matched | 1 | Oct 13, 2026 |
| B | LIMITLESS DESIGN STRATEGI NYC DOB building permits | 10 | General Construction · CORRECTION OF EXISTING VIOLATIONS THROUGH MINOR INTERIOR RENOVATIONS, ELECTRICAL WORKS, AND PLUMBING WORK TO RESTORE THE PROPERTY TO ITS ORIGINALLY APPROVED CERTIFICATE OF OCCUPANCY (C/O) CONDITIONS. NO CHANGE IN USE, OCCUPANCY OR EGRESS IS INVOLVED. No product keyword matched | 1 | Oct 13, 2026 |
| B | FOUNTAIN OF TREVI, INC NYC DOB building permits | 10 | Plumbing · SUBSEQUENT APPLICATION FILED HEREWITH FOR PLUMBING WORK TYPE, INSTALLATION OF NEW PLUMBING FIXTURES ON THE CELLAR, FIRST FLOOR, SECOND FLOOR AND ATTIC FLOOR; COLD AND HOT WATER PIPES No product keyword matched | 1 | Oct 13, 2026 |
| B | OUR ISLAND PROPERTY MANAG NYC DOB building permits | 10 | General Construction · APPLICATION FILED TO INDICATE INTERIOR RENOVATION OF EXISTING DOCTORS OFFICE.EXISTING CERTIFICATE OF OCCUPANCY #068339 No product keyword matched | 2 | Oct 13, 2026 |
| B | EVERYWHERE ENTERPRISE INC NYC DOB building permits | 10 | General Construction · PROPOSED 10-STORY RESIDENTIAL BUILDING WITH 31 DWELLING UNITS No product keyword matched | 3 | Oct 13, 2026 |
| B | MIRZA RAHMAN NYC DOB building permits | 10 | Construction Fence · FILING TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH NB APPLICATION # 421949529 No product keyword matched | 2 | Oct 13, 2026 |
| B | STAR DIAMOND CONSTRUCT IN NYC DOB building permits | 10 | General Construction · New roofing membrane at entry, replace lintels at garage entry, rebuild roof drain well and reflash drain, restore fireproofing at beams at garage, provide flashing at walls, provide pavers from fire escapes to exit. No product keyword matched | 1 | Oct 13, 2026 |
| B | HABITAT MANAGEMENT LLC NYC DOB building permits | 10 | Plumbing · HEREBY FILING FOR THE REPLACEMENT, RELOCATION AND INSTALLATION OF PLUMBING FIXTURES IN APARTMENT 11A. NO CHANGE TO USE OCCUPANCY OR EGRESS. No product keyword matched | 2 | Oct 13, 2026 |
| B | GUIDANCE REALTY CORPORATION NYC DOB building permits | 10 | Plumbing · 5 new 3pc bathrooms in apartment APT# 7, 27, 37, 47, 57 AND 4 new kitchens in APT #27,37,47,57 AND gas riser removal in APT # 27,37,47,57 No product keyword matched | 1 | Oct 13, 2026 |
| B | Renaissance Chelsea Hotel NYC DOB building permits | 10 | Suspended Scaffold · FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola No product keyword matched | 1 | Oct 13, 2026 |
| B | CORKHILL & CO., INC NYC DOB building permits | 10 | General Construction · INSTALL NEW BALCONY ENCLOSURES No product keyword matched | 1 | Oct 13, 2026 |
| B | MIN FA CONSTRUCTION CORP NYC DOB building permits | 10 | General Construction · INTERIOR RENOVATION OF AN EXISTING THREE-STORY BUILDING WITH PARTITION WORK AND PLUMBING WORK. PLUMBING WORK TO BE FILED UNDER SUBSEQUENT FILING. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Oct 13, 2026 |
| B | ZMG CONSTRUCTION CORPORAT NYC DOB building permits | 10 | Mechanical Systems · Proposed mechanical system installation at cellar, basement, first, second, and third floors. No change in Use, Egress, or Occupancy is proposed in this application.518 East 87th Street, NYC. No product keyword matched | 2 | Oct 13, 2026 |
| B | GMN CONSTRUCTION & CONTRACTING LLC NYC DOB building permits | 10 | General Construction · HEREWITH FILING FOR AN INTERIOR RENOVATION AT THE EXISTING FIRST FLOOR. FILING FOR THE REMOVAL AND REPLACEMENT OF PARTITIONS. FILING TO REFINISH FLOORS, REMOVAL AND REPLACEMENT OF CABINETS AND COUNTERS. NO CHANGE IN USE, EGRESS OR OCCUAPNCY. No product keyword matched | 1 | Oct 13, 2026 |
| B | I.M.P. PLG & HTG CORP NYC DOB building permits | 10 | General Construction · INTERIOR RENOVATION OF APARTMENT 4B ON THE 4TH FLOOR. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. No product keyword matched | 1 | Oct 13, 2026 |
| B | DL RESTORATION BUILDERS NYC DOB building permits | 10 | Mechanical Systems · MECHANICAL WORK FOR INSTALLATION OF NEW MULTI-SPLIT HEAT PUMP SYSTEM FOR APT 15AB ON 14TH FL AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 2 | Oct 13, 2026 |
| B | BEAUTRI REALTY CORP. NYC DOB building permits | 10 | Plumbing · FILING PLUMBING WORK TYPE IN CONJUNCTION WITH ALT2 APP M01376152 No product keyword matched | 1 | Oct 13, 2026 |
| B | MID DEVELOPERS INC NYC DOB building permits | 10 | Mechanical Systems · Install new central ac system for heating and cooling apartment 15A No product keyword matched | 2 | Oct 13, 2026 |
| B | MACK REAL ESTATE GROUP NYC DOB building permits | 10 | General Construction · ALTERATION TYPE 2 FILED HEREWITH FOR PROPOSED WHITE-BOX. SCOPE TO INCLUDE TWO NEW ADA BATHROOMS No product keyword matched | 4 | Oct 13, 2026 |
| B | CUBENINE INC NYC DOB building permits | 10 | General Construction · Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 1st floor (ODO Restaurant) as per plans. No change to use, egress or occupancy. No product keyword matched | 1 | Oct 13, 2026 |
| B | JJS BUILDERS NYC DOB building permits | 10 | Sidewalk Shed · PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 3 | Oct 13, 2026 |
| B | J.A. JENNINGS, INC NYC DOB building permits | 10 | General Construction · General construction to Cellar, Mezzanine and Floor 1 as per plans field herewith. No change in use, egress, or occupancy. No product keyword matched | 2 | Oct 13, 2026 |
| B | Yamata 74 Inc NYC DOB building permits | 10 | Mechanical Systems · REMOVE EXISTING INTERIOR PARTITIONS, DOORS AND ASSOCIATED COMPONENTS AS INDICATED. REPLACE EXISTING AIR HANDLER AT 1ST FLOOR AND ROOF. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Oct 13, 2026 |
| B | APC RENOVATION INC NYC DOB building permits | 10 | Mechanical Systems · Combination of 2 Apartments into 1 - 2nd and 3rd Fl units- No new C of O as per TECHNICALPOLICY AND PROCEDURE NOTICE #3/97- MECHANICAL WORK IN CONJUNCTION WITH THE OT#B01320250-I1 No product keyword matched | 1 | Oct 13, 2026 |
| B | CCM Services Group Inc NYC DOB building permits | 10 | Supported Scaffold · PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 3 | Oct 13, 2026 |
| B | 4812 REALTY LLC NYC DOB building permits | 10 | Plumbing · Plumbing work filed in conjunction with GC #B00977531-I1 No product keyword matched | 2 | Oct 13, 2026 |
| B | Rapid Contracting, Inc. NYC DOB building permits | 10 | Supported Scaffold · INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 2 | Oct 13, 2026 |
| B | MCMAHON-BAEK ARCHITECURE DPC NYC DOB building permits | 10 | Plumbing · Plumbing Modifications as per plans filed herewith, No change in use, occupancy, or egress. No product keyword matched | 2 | Oct 13, 2026 |
| B | LINA K. REALTY CORP NYC DOB building permits | 10 | Mechanical Systems · INSTALL SPLIT TYPE A/C SYSTEM ON THE 1ST FLOOR. AND ROOF. NO CHANGE IN USE, OCCUPANCY & EGRESS. No product keyword matched | 1 | Oct 13, 2026 |
| B | BED PARK 18 LLC. NYC DOB building permits | 10 | Plumbing · EXISTING TWO-FAMILY HOUSE WITH PLUMBING WORK AT BASEMENT,1 ST AND 2ND FLOOR. JOB FILED TO RELATED TO ALT2 APPLICATION # B01347922-I1.2. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY No product keyword matched | 1 | Oct 13, 2026 |
| B | 3071 29th Street LLC NYC DOB building permits | 10 | General Construction · PROPOSED A 6-STORY RESIDENTIAL BUILDING No product keyword matched | 2 | Oct 13, 2026 |
| B | M & J ELECTRICAL CONTRAC NYC DOB building permits | 10 | General Construction · Minor interior partition work to address ECB Violations 39177167Z; 39177164N; 39177165P; 39177166R. No change to use, egress or occupancy. No product keyword matched | 1 | Oct 13, 2026 |
| B | HERITAGE REALTY SERVICES LLC. NYC DOB building permits | 10 | Plumbing · Minor plumbing work related to CVS renovation. No change to use, egress or occupancy. No product keyword matched | 1 | Oct 13, 2026 |
| B | Eastcoast NYC DOB building permits | 10 | Sprinklers · Plumbing Scope of work Gas Meter Upgrade and New Gas Piping to Paint Spray Booth Burner Unit. New Gas Piping to Re-located Heating Units. New ADA Bathroom in waiting Area. Plumbing Scope of work Gas Meter Upgrade and New Gas Piping to Paint Spray Booth Bu No product keyword matched | 1 | Oct 13, 2026 |
| B | EP HOME IMPROVMENTS INC NYC DOB building permits | 10 | General Construction · FILING FOR INTERIOR RENOVATION OF APARTMENT 4B, AND ADDRESS WWOP ECB VIOLATION 39171552H. NO LAYOUT CHANGES. NO CHANGE IN USE, OCCUPATION OR EGRESS. No product keyword matched | 1 | Oct 13, 2026 |
| B | WONG KWONG HOP INC. NYC DOB building permits | 10 | Plumbing · PROPOSED PLUMBING WORK ON PROPOSED 1 STORY EXTENSION No product keyword matched | 2 | Oct 13, 2026 |
| B | BLUE OWL MANAGEMENT LLC NYC DOB building permits | 10 | General Construction · Filing Cycle 9C FISP masonry facade repairs, as per plans filed herewith. No change to use, egress or occupancy under this application. No product keyword matched | 1 | Oct 13, 2026 |
| B | TANG BROTHERS HOLDINGS CORP. NYC DOB building permits | 10 | Plumbing · FILE PLUMBING WORK AT APT #9, #11,#12 ON 4TH FLOOR TO REPLACE PLUMBING FIXTURES AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 3 | Oct 13, 2026 |
| B | Astoria Realty Partners LLC NYC DOB building permits | 10 | Plumbing · DIRECT REPLACEMENT OF EXISTING PLUMBING FIXTURES TO EXISTING ROUGHING CONSISTING OF THREE-PIECE BATHROOM, RESIDENTIAL SINK AND GAS STOVE TO EXISTING ROUGHING AFTER THE APPLICIANCE GAS SHUT-OFF VALVE IN APT NO: 4A & 1B No product keyword matched | 4 | Oct 13, 2026 |
| B | 1870 WEave LLC NYC DOB building permits | 10 | Plumbing · FILING HEREWITH PLUMBING WORK TYPE IN CONNECTION WITH THE RENOVATION OF EXISTING TWO-FAMILY RESIDENCE. NO CHANGE IN USE, EGRESS, AND OCCUPANCY INVOLVED UNDER THIS APPLICATION. No product keyword matched | 2 | Oct 13, 2026 |
| B | Greenwich House Coop. Apts., Inc. NYC DOB building permits | 10 | General Construction · REPAIR AND RESTORATION OF EXISTING EXTERIOR WOOD CORNICE, INCLUDING LOCALIZED IN-KIND REPLACEMENT, SURFACE PREPARATION, PRIMING AND PAINTING TO MATCH EXISTING CONDITIONS. NO CHANGE TO USE, OCCUPANCY, BULK OR EGRESS. No product keyword matched | 2 | Oct 13, 2026 |
| B | ABM OWNER LLC NYC DOB building permits | 10 | Suspended Scaffold · OUTRIGGERS SYSTEM INSTALLATION FOR FACADE INSPECTION AND OR REPAIRS, NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 3 | Oct 13, 2026 |
| B | 138-09 JAMAICA AVE, LLC NYC DOB building permits | 10 | Plumbing · PLUMBING WORK No product keyword matched | 2 | Oct 13, 2026 |
| B | HAITIAN CENTERS COUNCIL, INC. NYC DOB building permits | 10 | Boiler Equipment · REPLACE MODULAR GAS BOILERS (NYC BOILER No. MD 7529-01,02,03,04) WITH ONE (1) DIRECT VENT GAS-FIRED BOILER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 3 | Oct 13, 2026 |
| B | JOTAKA MODERN HOME RENOVATIONS INC. NYC DOB building permits | 10 | Construction Fence · FILING TO INSTALL CONSTRUCTION FENCE AT OSP. No product keyword matched | 2 | Oct 13, 2026 |
| B | THIS IS NOT A BUISNESS NYC DOB building permits | 10 | Plumbing · Application is being filed for the plumbing work at the subject premises as per plans submitted herewith. There are no change in use, egress or occupancy. No product keyword matched | 3 | Oct 13, 2026 |
| B | Le Lotus Bleu NYC DOB building permits | 10 | General Construction · CREATE NEW ACCESSORY BATHROOM IN CELLAR No product keyword matched | 2 | Oct 13, 2026 |
| B | THE CHEROKEE 8A GROUP INC NYC DOB building permits | 10 | General Construction · NEW ENLARGEMENT EXISTING DAYCARE. NEW PARTITIONS, STRUCTURAL WORK, STAIRS WITH WALL AND FLOOR FINISHES. NEW C OF O TO BE OBTAINED No product keyword matched | 2 | Oct 13, 2026 |