Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | S & J INDUSTRIAL CORP NYC DOB building permits | 10 | Sprinklers · plumbing and sprinkler work in conjunction with GC #B00972089-I1 No product keyword matched | 3 | Oct 13, 2026 |
| B | PLATINUM NYC DOB building permits | 10 |
| 2 |
| Oct 13, 2026 |
| B | KLARACON LLC NYC DOB building permits | 10 | General Construction · ARCHITECTURAL RENOVATION OF COMMERCIAL SPACE ON 1ST FLOOR & (3) BATHROOMS ON 1ST FLOOR & CELLAR LEVEL OF A (17) STORY MIXED USE BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Oct 13, 2026 |
| B | Seagis Property Group NYC DOB building permits | 10 | Plumbing · CAP AND REMOVE EXISTING FIXTURES AND INSTALL NEW FIXTURES IN FRONT OF THE BUILDING WITH NEWSITE CONNECTION PROPOSAL. NO CHANGE IN USE, EGRESS OR OCCUPANCY No product keyword matched | 1 | Oct 13, 2026 |
| B | DGJ CONTRACTING INC NYC DOB building permits | 10 | Construction Fence · application for temp. construction fence No product keyword matched | 4 | Oct 13, 2026 |
| B | SAMI CONSTRUCTION & REMOD NYC DOB building permits | 10 | Mechanical Systems · MECHANICAL MODIFICATIONS TO SINGLE FAMILY HOME AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Oct 13, 2026 |
| B | PLUNGERI LLC NYC DOB building permits | 10 | Support of Excavation · SUPPORT OF EXCAVATION APPLICATION BEING FILED FOR NEW BUILDING. No product keyword matched | 4 | Oct 13, 2026 |
| B | METRO LOFT DEVELOPERS NYC DOB building permits | 10 | Mechanical Systems · Mechanical work as shown on the plans. No product keyword matched | 3 | Oct 13, 2026 |
| B | GENESIS PLBG AND HTG CORP NYC DOB building permits | 10 | Plumbing · WORK TO APT 6J/6K AT THE 6TH FLOOR OF AN EXISTING 29-STORY, MULTIPLE DWELLING BUILDING. ALTERATIONS TO INCLUDE REMOVED AND REPLACED PLUMBING FIXTURES. NO CHANGE TO ZONING, USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 1 | Oct 13, 2026 |
| B | ARJ MECHANICAL INC NYC DOB building permits | 10 | Plumbing · PLUMBING WITH THE RENOVATION OF APARTMENT 10P ON THE 10TH FLOOR. AS PER PLANS FILED. NO CHANGE OF USE, EGRESS, OR OCCUPANCY. No product keyword matched | 3 | Oct 13, 2026 |
| B | 125 Brook St. Property, LLC NYC DOB building permits | 10 | Curb Cut · CURB CUT 17' No product keyword matched | 2 | Oct 13, 2026 |
| B | POWER PLUMBING & HEATING NYC DOB building permits | 10 | Plumbing · AN EXISTING COMMERICAL SPACE WITH PLUMBING WORK ON GROUND FLOOR ONLY.THIS APPLICATION IS RELTED TO DOB ALT 2 JOB #M01238269-I1.NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 1 | Oct 13, 2026 |
| B | NY PROCONSTRUCITON INC NYC DOB building permits | 10 | General Construction · FILING ALT-2 FOR APT 12 C THAT ENCOMPASSES INTERIOR REMOVALS AND RENOVATIONS. THE WORK WILL NCLUDE REPAIR AND REPLACEMENT OF NON-LOAD BEARING PARTITIONS, NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 2 | Oct 13, 2026 |
| B | BELL CONSTRUCTION OF NY NYC DOB building permits | 10 | General Construction · FILING TO ADDRESS RCA ISSUED UNDER COMPLAINT NUMBER 3A44200. REMOVING BRICK WALL AND WINDOWS TO REPLACE WITH GARAGE DOOR TO RESTORE TO PRIOR LEGAL CONDITION. No product keyword matched | 1 | Oct 13, 2026 |
| B | LEMOR REALTY CORP NYC DOB building permits | 10 | General Construction · REMOVE CORNICE AND INSTALL BRICKS AS PER PLANS . NO CHANGE IN USE, EGRESS OR OCCUPANCY WITH THIS APPLICATION. No product keyword matched | 5 | Oct 13, 2026 |
| B | XD DEV. GROUP LLC NYC DOB building permits | 10 | General Construction · HORIZONTAL ENLARGMENT WITH INTEROIR RENOVATAION TO AN EXISTING THREE STROY MIX USE BUILING No product keyword matched | 1 | Oct 13, 2026 |
| B | BROTHERS CONSTRUCTION GRO NYC DOB building permits | 10 | General Construction · FILING FOR INTERIOR RENOVATION OF AN EXISTING TWO FAMILY, NEW PARTITION WALLS, FINISH FLOORING, NEW INTERIOR DOORS, NEW TILES AND NEW PLUMBING FIXTURES AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY No product keyword matched | 3 | Oct 13, 2026 |
| B | BRIGUGLIO CONSULTING NYC DOB building permits | 10 | General Construction · MINOR INTERIOR WORK TO INCLUDE NEW INTERIOR FINISHES. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Oct 13, 2026 |
| B | AAU FIFTH AVENUE REALTY LLC NYC DOB building permits | 10 | Sign · Install illuminated wall sign reading TD - facing MacDonough St No product keyword matched | 1 | Oct 13, 2026 |
| B | RITE WAY FIRE SPINKLER CO NYC DOB building permits | 10 | Sprinklers · PROPOSED SPRINKLER WORK (SP) IN CONJUNCTION WITH B01230557-I1 No product keyword matched | 6 | Oct 13, 2026 |
| B | NAZARIAN PROPERTY NYC DOB building permits | 10 | Sprinklers · INSTALLATION OF SPRINKLER FILING IN CONJUNCTION WIHT APPLICATION # M01405728. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 2 | Oct 13, 2026 |
| B | MASON CONSTRUCTION SERVIC NYC DOB building permits | 10 | General Construction · Facade repairs as per plans filed herewith. No change to use, egress, or occupancy. No product keyword matched | 1 | Oct 13, 2026 |
| B | Parkview Financial NYC DOB building permits | 10 | Mechanical Systems · MODIFICATION TO EXISTING MECHANICAL SYSTEM AND RELATED PIPING. INSTALLATION OF NEW A/C UNITS AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 5 | Oct 13, 2026 |
| B | RXR 810 Fulton Owner LLC NYC DOB building permits | 10 | Sprinklers · Modification of sprinkler system as shown on submitted plans. No change in occupancy, use or egress. No product keyword matched | 4 | Oct 13, 2026 |
| B | CYPRESS HILLS CHILD CARE CORPORATIO NYC DOB building permits | 10 | Mechanical Systems · Mechanical trade as per plans filed herewith in conjunction with NB application # 321601398. No product keyword matched | 4 | Oct 13, 2026 |
| B | RED HILL RESTORATION CORP NYC DOB building permits | 10 | General Construction · REBUILD FRONT PARAPET AS SHOWN ON PLANS. No product keyword matched | 1 | Oct 13, 2026 |
| B | LEEDING BUILDERS GROUP LL NYC DOB building permits | 10 | General Construction · CONTRACTOR INSTALLATION OF MANUFACTURED TEMPORARY CONSTRUCTION TRAILERS PROVIDED BY VENDOR. NO ALTERATIONS TO EXISTING BUILDING INTERIOR BASE BUILDING ENVELOPE, HVAC/MECHANICAL, OR LIGHTING SYSTEMS. No product keyword matched | 2 | Oct 13, 2026 |
| B | SHA HOME IMPROVEMENT INC NYC DOB building permits | 10 | Suspended Scaffold · FACADE RESTORATION ON EAST & WEST ELEVATION USING OUTRIGGER SUSPENDED SCAFFOLD (ADJUSTABLE) No product keyword matched | 1 | Oct 13, 2026 |
| B | ANVA LLC NYC DOB building permits | 10 | General Construction · INSTALLATION OF A BALCONY ON THE SECOND FLOOR ABOVE THE REAR YARD, REPLACEMENT OF EXISTING WINDOW WITH A DOOR. No product keyword matched | 1 | Oct 13, 2026 |
| B | ACCARDO ENGINEERING NYC DOB building permits | 10 | Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF. No product keyword matched | 1 | Oct 13, 2026 |
| B | JBJ CONCRETE RENOVATIONS NYC DOB building permits | 10 | General Construction · General construction related to the renovation of an existing (3) family residence. No product keyword matched | 1 | Oct 13, 2026 |
| B | DEZER PROPERTIES NYC DOB building permits | 10 | Sidewalk Shed · INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 2 | Oct 13, 2026 |
| B | ALADDIN PLUMBING CORP NYC DOB building permits | 10 | Plumbing · subsequent filing for plumbing works. No product keyword matched | 1 | Oct 13, 2026 |
| B | Union Housing Preservation, LP NYC DOB building permits | 10 | Sidewalk Shed · Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 1 | Oct 13, 2026 |
| B | KEREM MANAGEMENT NYC DOB building permits | 10 | Sidewalk Shed · INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 1 | Oct 13, 2026 |
| B | CHARLES MCINNIS NYC DOB building permits | 10 | Construction Fence · APPLICATION FILED FOR TEMPORARY CONSTRUCTION FENCE No product keyword matched | 1 | Oct 13, 2026 |
| B | LIBERTY CHATEAU NYC DOB building permits | 10 | Construction Fence · Fence for vacant lot No product keyword matched | 1 | Oct 13, 2026 |
| B | THE 2121 SHORE CONDOMINIUM NYC DOB building permits | 10 | Supported Scaffold · PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 5 | Oct 13, 2026 |
| B | 1427 FULTON ST INC NYC DOB building permits | 10 | Construction Fence · INSTALL 8' CONSTRUCTION FENCE AT ABOVE ADDRESS IN CONJUNCTION WITH JOB#340760849 No product keyword matched | 1 | Oct 13, 2026 |
| B | SORRISO 26 LLC NYC DOB building permits | 10 | Construction Fence · INSTALLATION OF TEMPORARY CONS. FENCE IN CONJUNCTION WITH ALTERATION APPLICATION X01193843-I1 No product keyword matched | 2 | Oct 13, 2026 |
| B | SIDEVIEW REALTY HOLDING LLC NYC DOB building permits | 10 | Plumbing · Exterior Storm Piping No product keyword matched | 2 | Oct 13, 2026 |
| B | Made in Bk NYC DOB building permits | 10 | Sidewalk Shed · INSTALLATION OF HEAVY-DUTY SIDEWALK SHED FOR NEW BUILDING AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. No product keyword matched | 4 | Oct 13, 2026 |
| B | J BUILDERS NYC DOB building permits | 10 | Construction Fence · HEREWITH FILING FOR FENCE APPLICATION No product keyword matched | 1 | Oct 13, 2026 |
| B | B&B CONTRACTING GRP LLC NYC DOB building permits | 10 | General Construction · Filing plans herewith for the interior renovation for a new Candy Land retail store. No change to use, egress, or occupancy. No product keyword matched | 2 | Oct 13, 2026 |
| B | AMTAD LLC NYC DOB building permits | 10 | Sprinklers · FILING HEREWITH SPRINKLER WORK AS PER PLANS, NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Oct 13, 2026 |
| B | TISHMAN REAL ESTATE MANAGEMENT NYC DOB building permits | 10 | Sign · PROPOSE NEW ILLUMINATED, NON FLASHING, ACCESSORY BUSINESS SIGN FOR EXISTING PARTIAL FIRST FLOOR COMMERCIALSPACE. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 3 | Oct 13, 2026 |
| B | ROUFAIL MANAGEMENT LLC NYC DOB building permits | 10 | Supported Scaffold · PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 3 | Oct 13, 2026 |
| B | PRIMARY BUILT LLC NYC DOB building permits | 10 | General Construction · INTERIOR ALTERATIONS TO INCLUDE PARTITION, DOOR, FINISHES WORK. NO CHANGE TO USE, OCCUPANCY OR EGRESS No product keyword matched | 3 | Oct 13, 2026 |
| B | SKY RISE RESTORATION INC NYC DOB building permits | 10 | Suspended Scaffold · Suspended Scaffold for Facade Restoration as Shown on Plans No product keyword matched | 2 | Oct 13, 2026 |
| B | #1 LORZA RENOVATIONS INC NYC DOB building permits | 10 | General Construction · APPLICATION FILED TO SUPERSEDE 1994 APPLICATION 100869696 FOR APARTMENT 32-A FOR A NEW SHOWER AND MINOR PARTITIONS. NO NEW WORK IS PROPOSED. THE GENERAL CONSTRUCTION PORTION WAS PERMITTED UNDER THE ORIGINAL FILING. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Oct 13, 2026 |