General Construction · APARTMENT RENOVATION THROUGHOUT, INCLUDING LAYOUT MODIFICATIONS TO KITCHEN AND MASTER SUITE. BATHROOM PLUMBING FIXTURES TO BE REPLACED AND/OR RELOCATED IN ALL BATHROOMS. UPGRADE MODIFICATIONS TO LIGHTING, POWER AND FINISHES THROUGHOUT.
General Construction · APARTMENT RENOVATION THROUGHOUT, INCLUDING LAYOUT MODIFICATIONS TO KITCHEN AND MASTER SUITE. BATHROOM PLUMBING FIXTURES TO BE REPLACED AND/OR RELOCATED IN ALL BATHROOMS. UPGRADE MODIFICATIONS TO LIGHTING, POWER AND FINISHES THROUGHOUT.
No product keyword matched · NYC DOB building permits
Mechanical Systems · INSTALLATION OF (1) OUTDOOR CONDENSER UNIT AND (5) INDOOR AIR HANDLING UNITS FOR A SPLIT HVAC SYSTEM, INCLUDING DUCTWORK, DIFFUSERS, CONDENSATE DRAINS, REFRIGERATION PIPING WITH INSULATION, AND FLEXIBLE CONNECTORS.
No product keyword matched · NYC DOB building permits
Mechanical Systems · INSTALLATION OF (1) OUTDOOR CONDENSER UNIT AND (5) INDOOR AIR HANDLING UNITS FOR A SPLIT HVAC SYSTEM, INCLUDING DUCTWORK, DIFFUSERS, CONDENSATE DRAINS, REFRIGERATION PIPING WITH INSULATION, AND FLEXIBLE CONNECTORS.
No product keyword matched · NYC DOB building permits
General Construction · New opening to the terrace through the existing masonry wall, installation of new doors. No change in use, egress, or occupancy.
No product keyword matched · NYC DOB building permits