Mechanical Systems · FILE MECHANICAL WORK TO INSTALL (2)SPLIT HVAC UNITS AT YARD FACING STAGG STREET OF PUBLIC SCHOOL K450. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
No product keyword matched · NYC DOB building permits
Mechanical Systems · FILE MECHANICAL WORK TO INSTALL (2)SPLIT HVAC UNITS AT YARD FACING STAGG STREET OF PUBLIC SCHOOL K450. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
No product keyword matched · NYC DOB building permits
Sprinklers · Temporary, phased sprinkler work on the 1st floor includes removal, capping, installation, and relocation of concealed and upright SP heads with new piping, firestop adjustments, and minor interior work. No change to use, egress or occupancy.
No product keyword matched · NYC DOB building permits
Plumbing · Relocation of 6 domestic and fire water services into Stuyvesant High School. Relocated Water Mains to enter the cellar at the east foundation wall, reconnect to existing backflow preventers, and include new house control valves at the new entry point.
No product keyword matched · NYC DOB building permits
Plumbing · Temp., phased plumbing work includes selective removal, capping, and installation of service sinks and floor drains, w/ firestop adjustments, all staged to maintain building operations and temporary egress rerouting. No change to use, egress or occupancy.
No product keyword matched · NYC DOB building permits
Mechanical Systems · FILE MECHANICAL WORK TO INSTALL (2)TWO OUTDOOR CONDENSER UNITS AT CELLAR AREAWAY FOR GYM OF PUBLIC SCHOOL X166. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
No product keyword matched · NYC DOB building permits
Mechanical Systems · FILE MECHANICAL WORK TO INSTALL (10)TEN SPLIT HVAC UNITS AT ROOF OF PUBLIC SCHOOL Q460 FOR 1ST FLOOR GYM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
No product keyword matched · NYC DOB building permits
Mechanical Systems · FILE MECHANICAL WORK TO INSTALL (4)FOUR SPLIT HVAC UNITS AT ROOF OF PUBLIC SCHOOL Q460 FOR 1ST FLOOR GYM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
No product keyword matched · NYC DOB building permits
Mechanical Systems · FILE MECHANICAL WORK TO INSTALL (8)SPLIT HVAC UNITS AT ROOF OF PUBLIC SCHOOL Q460 FOR 1ST FLOOR CAFETERIA. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
No product keyword matched · NYC DOB building permits
General Construction · Limited int. work on 1st & 2nd flrs to temp. close N-side egress doors (101,102,117,132,153,P2-X1X4). Egress via Lobby A/B, Receiving (1st) & Chambers St Bridge (2nd). Int. restored to code post-const. No change to use, egress, or occupancy. see comments.
No product keyword matched · NYC DOB building permits
Mechanical Systems · TEMPORARY, PHASED MECHANICAL WORK INCLUDING REMOVAL, PROTECTION, AND REINSTALLATION OF DUCTWORK MODIFICATIONS WITH LOCALIZED DUCT INSTALLATION/REMOVAL AND MINIMAL DISRUPTION THROUGH COORDINATED PHASING. NO CHANGE TO USE EGRESS, OR OCCUPANCY.
No product keyword matched · NYC DOB building permits
Mechanical Systems · FILE MECHANICAL WORK TO INSTALL (2)TWO OUTDOOR CONDENSER UNITS AT CELLAR AREAWAY FOR CAFETERIA OF PUBLIC SCHOOL X166. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
No product keyword matched · NYC DOB building permits
Mechanical Systems · FILE MECHANICAL WORK TO INSTALL (3)THREE OUTDOOR CONDENSER UNITS AT 2ND FL. ROOF TERRACE FOR AUDITORIUM OF PUBLIC SCHOOL X166. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
No product keyword matched · NYC DOB building permits
Sprinklers · REMOVE (2) SPRINKLER HEADS AND ASSOCIATED PIPING IN ROOM 336. BRANCH OFF FEEDING DEMOLISHED SPACE SHALL BE REROUTED TO ACCOMODATE RELOCATED SPRINKLER HEADS AS PER NEW ROOM LAYOUT.
No product keyword matched · NYC DOB building permits
Mechanical Systems · INSTALLATION OF UNIT VENTILATORS WITH HEAT PUMPS FOR OT/PT ROOM 129 AND CLASSROOM 336. CONDENSER SHALL BE MOUNTED ON ROOF. INSTALLATION OF REFRIGERANT AND CONDENSATE PIPING. INSTALLATION OF ELECTRICAL WIRING AND CONTROLS. BALANCING OF DUCTWORK.
No product keyword matched · NYC DOB building permits
General Construction · CONVERT ROOM 336 FROM STORE ROOM INTO CLASSROOM, ROOM 129 FROM BOOK STORE INTO OT/PT. INFILL EXISTING CLOSET DOOR OPENING ON THE CORRIDOR, INSTALL NEW DOOR TO CLOSET IN ROOM 129, NEW VCT FLOOR FINISH IN ROOMS 129 & 336, NEW DROP CEILING IN ROOM 336.