Sprinklers · Installation of Pantry Plumbing Fixtures, Non-Gas Water Heater & Associated Piping and Modifications to Existing Sprinkler System on Part of 17th Floor
Sprinklers · Installation of Pantry Plumbing Fixtures, Non-Gas Water Heater & Associated Piping and Modifications to Existing Sprinkler System on Part of 17th Floor
No product keyword matched · NYC DOB building permits
General Construction · Installation of Partitions, Doors, Suspended Ceiling, Millwork, Floor & Wall Finishes on Part of 17th Floor (Amenity Suite). No Change to Occupancy, Use or Egress is Proposed
No product keyword matched · NYC DOB building permits
Sprinklers · Installation of Pantry Plumbing Fixtures, Non-Gas Water Heater & Associated Piping and Modifications to Existing Sprinkler System on Part of 17th Floor
No product keyword matched · NYC DOB building permits
Mechanical Systems · Modifications to Existing Air Conditioning Ductwork, Install VAV Boxes, Transfer Air Ducts, Supply Air Diffusers and Return Air Grilles on Part of 17th Floor
No product keyword matched · NYC DOB building permits
General Construction · Minor Demolition of Partitions & Doors, Installation of Partitions, Doors, Suspended Ceiling, Millwork, Wall & Floor Finishes on Part of 40th Floor (Suite 4000). No Change to Occupancy, Use or Egress is Proposed
No product keyword matched · NYC DOB building permits
Mechanical Systems · Remove Existing Air Conditioning Unit & Associated Ductwork, Install Air Conditioning Ductwork, Supply Air Diffusers, Return Air Grilles and Volume Dampers on Part of the 40th Floor (Suite 4000)
No product keyword matched · NYC DOB building permits
Plumbing · Installation of Pantry Plumbing Fixtures, Appliances & Associated Piping, Relocate Floor Drain & Modify Associated Piping and Modifications to Existing Sprinkler System on Part of the 40th Floor (Suite 4000)
No product keyword matched · NYC DOB building permits
Plumbing · Installation of Pantry Plumbing Fixtures, Appliances & Associated Piping, Relocate Floor Drain & Modify Associated Piping and Modifications to Existing Sprinkler System on Part of the 40th Floor (Suite 4000)
No product keyword matched · NYC DOB building permits
Structural · Exterior repairs consisting of facade repairs, steel beams, parapet reconstruction, shoring, structural repairs and installation of roofing system as per plans filed herewith. No change to use, egress or occupancy.
No product keyword matched · NYC DOB building permits
Structural · Exterior repairs consisting of facade repairs, steel beams, parapet reconstruction, shoring, structural repairs and installation of roofing system as per plans filed herewith. No change to use, egress or occupancy.
No product keyword matched · NYC DOB building permits