Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/Fox Electric Co
Back to prospects

Fox Electric Co

SEATTLE, WA · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 4 / 20Tier C
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness3 / 5Latest signal is within 180 days.
Place0 / 5WA is outside the seller’s region and target regions.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
Fox Electric Co
Source for Company (opens in new tab)
Signal source
Seattle electrical permits
Signal date
Jul 22, 2026
Source for Signal date (opens in new tab)
Signal count
4 saved signals, 0 in the last 90 days
Signal summary
Kitchen remodel at the existing school. Replacement of existing branch panels to support revised equipment. Includes new sub panel for relocated equipment. [7/22/2026 BGO - Approved Plan Set] · Electrical
Source for Signal summary (opens in new tab)
Address
Not found
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

4 signals
  • Jul 22, 2026
    Permit
    Kitchen remodel at the existing school. Replacement of existing branch panels to support revised equipment. Includes new sub panel for relocated equipment. [7/22/2026 BGO - Approved Plan Set] · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jul 2, 2026
    Permit
    Renovation of existing classroom spaces. Includes new panel and feeder to support new layout. Also includes administration offices. [7/2/26 KEF - Plan set approved.] · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jul 1, 2026
    Permit
    Provide a new rooftop electrical panel and associated branch wiring for the rooftop HVAC equipment. Includes work inside the classroom for the fan cooling units and ERVs. 7/1/2026 BGO - Approved Plan Set] [7/22/26 BGO - Approved Revised Plan Set; RTU and (2)EF's Added] · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jun 25, 2026
    Permit
    Provide a 100amp 208volt 3phase temporary power feeder from an existing inside panel to an outdoor disconnect switch. This will serve the construction project. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)