From the panel run the wire to the back yard for hot tub outlet, the wires will be ready for the future 40A 240v outlet after the service be upgraded, at this time it is 120V 20A outlet. · Electrical
No product keyword matched · Seattle electrical permits
Replace the existing100A panel in basement.
Wiring for construction: moving bathroom, heater, laundry, convert the old bathroom to bed room.
Move water heater to garage.
Install 50A outlet in the garage for EV charger in future. · Electrical
No product keyword matched · Seattle electrical permits