Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/Securitas
Back to prospects

Securitas

SEATTLE, WA · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 5 / 20Tier C
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness4 / 5Latest signal is within 90 days.
Place0 / 5WA is outside the seller’s region and target regions.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
Securitas
Source for Company (opens in new tab)
Signal source
Seattle electrical permits
Signal date
Aug 25, 2026
Source for Signal date (opens in new tab)
Signal count
12 saved signals, 1 in the last 90 days
Signal summary
Installation: General Overview of installing video in Starbucks stores 1) Unless stated in specific SOW (section III), please order parts ASAP and schedule work directly with the store partners as soon as parts and resources are available. 2) Tech to reference New Store Installation Documents. IF YOU DON'T HAVE A COPY REQUEST ONE 3) If camera licenses are to be ordered. Use SN of the NVR provided in this scope. a) Order licenses from Genetec using SN provide b) Have SES Video Triage · Electrical
Source for Signal summary (opens in new tab)
Address
Not found
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

12 signals
  • Aug 25, 2026
    Permit
    Installation: General Overview of installing video in Starbucks stores 1) Unless stated in specific SOW (section III), please order parts ASAP and schedule work directly with the store partners as soon as parts and resources are available. 2) Tech to reference New Store Installation Documents. IF YOU DON'T HAVE A COPY REQUEST ONE 3) If camera licenses are to be ordered. Use SN of the NVR provided in this scope. a) Order licenses from Genetec using SN provide b) Have SES Video Triage · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Aug 6, 2026
    Permit
    They had 2 heat probes in the garage area but had to take down after a ceiling flood. This would be to add those 2 back up and add 2 more as per state code now. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jul 27, 2026
    Permit
    Install WLS UNVRSL,TRNSMTR, WIRELESS PIR, 360 DEGREE MOTION DETECTOR, and REPEATER,TWO WAY · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jul 21, 2026
    Permit
    Customer has an MS4 Firelite panel and will be moving it to an MS5 panel. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jun 30, 2026
    Permit
    Disconnect/reconnect new ATM · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jun 16, 2026
    Permit
    Install (5) Hanwha XND-6083RV IP Interior Cameras, Install (1) Verint IP Height Strip Camera, Install (1) ViewZ IP PVM Camera, Install (1) Verint 360 Camera, Install (3) Hanwha XNV-C6083R IP Exterior Cameras, Add (1) additional 24 Port Smart Switch · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jun 9, 2026
    Permit
    This would be to add a DMP XR 150 Kit (Box, Panel, Batt., 1 keypad & Siren) to replace a discontinued Bosch D7412GV3 with hardwired Zones. We will be adding an 8 Zone Expander, Cell unit and a Radionics Popit module. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jun 8, 2026
    Permit
    This would be to add a DMP Universal Cell to a DSC 864 Security panel over phone lines. This would remove phone lines and added cell unit. Test with call center. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • May 29, 2026
    Permit
    Disconnect WU ATM Burg/Duress/Top Hat Contact (if applicable) from Branch Pacom Panel, Disconnect/Remove & Scrap (1) ATM Transaction camera · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • May 22, 2026
    Permit
    This would be to add a DMP XR 150 Kit (Box, Panel, Batt., 1 keypad & Siren) to replace a discontinued Bosch D7412GV3 with hardwired Zones. We will be adding Cell unit and a Radionics Popit module. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • May 14, 2026
    Permit
    Replace 7 indoor fixed dome cameras · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • May 14, 2026
    Permit
    Replace 7 indoor fixed dome cameras · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)