Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/REIDY CONTRACTING GROUP
Back to prospects

REIDY CONTRACTING GROUP

Brooklyn, Manhattan, NY · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 10 / 20Tier B
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness4 / 5Latest signal is within 90 days.
Place5 / 5NY matches the seller’s region.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
REIDY CONTRACTING GROUP
Source for Company (opens in new tab)
Signal source
NYC DOB building permits
Signal date
Oct 8, 2026
Source for Signal date (opens in new tab)
Signal count
33 saved signals, 11 in the last 90 days
Signal summary
General Construction · Interior demolition and minimal build back of an existing building. No change of use, egress, or occupancy.
Source for Signal summary (opens in new tab)
Address
58 W 40TH STREET 2ND FL
Source for Address (opens in new tab)
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

33 signals
  • Oct 8, 2026
    Permit
    General Construction · Interior demolition and minimal build back of an existing building. No change of use, egress, or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 8, 2026
    Permit
    Mechanical Systems · Removal of existing split refrigerant AC systems serving third through fifth floors. Existing steam boiler shall be removed in its entirety. Cellar, third through fifth floors will be provided with electric unit heaters.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 6, 2026
    Permit
    Mechanical Systems · Remove and replace ductwork and equipment on partial 1st, 2nd and 3rd floors in the medical offices as per plans filed herewith only.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Sep 22, 2026
    Permit
    General Construction · General construction modifications taking place on the 1st floor & 1st Fl Mezz as per plans filed herewith. No change in use, egress or occupancy
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Sep 22, 2026
    Permit
    Structural · Structural modifications taking place on the 1st floor & 1st Fl Mezz as per plans filed herewith. No change in use, egress or occupancy
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Sep 22, 2026
    Permit
    Mechanical Systems · Mechanical modifications taking place on the 1st floor as per plans filed herewith. No change in use, egress or occupancy
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Sep 22, 2026
    Permit
    General Construction · General construction modifications taking place on the 1st floor & 1st Fl Mezz as per plans filed herewith. No change in use, egress or occupancy
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Sep 22, 2026
    Permit
    Structural · structural modifications taking place on the 1st floor as per plans filed herewith. No change in use, egress or occupancy
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Sep 3, 2026
    Permit
    General Construction · Remove and install new partitions and finishes on partial 1st, 2nd and 3rd floors in the existing medical offices as per plans filed herewith only.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Aug 24, 2026
    Permit
    Mechanical Systems · Mechanical work for conversion of first and second floor commercial use to educational use.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Aug 24, 2026
    Permit
    Protection and Mechanical Methods · INSTALLATION OF TEMPORARY PLYWOOD ENCLOSURE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Aug 6, 2026
    Permit
    Mechanical Systems · Removal and installation of ductwork. Relocation of existing supply and return diffusers, and relocation of existing thermostats . Installation of new transfer ducts and fire dampers. at unit 34th. No change to use, egress, occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Aug 4, 2026
    Permit
    General Construction · Demolition and restoration of the existing 3rd Floor office buildout (Unit 34) at Major League Soccer's existing 420 5th Avenue office, per lease requirement. No change to use, egress or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jul 15, 2026
    Permit
    Structural · Structural framing as part of conversion from commercial use to educational use.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jul 6, 2026
    Permit
    General Construction · Interior renovation of an existing commercial & office building. Replacement of two exterior storefront bays. Change of use from commercial to educational for level 1 and level 2. Existing use to remain on cellar and level 3 to level 5.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jul 2, 2026
    Permit
    General Construction · Interior renovation to partitions, ceilings and doors as shown on plans. No change in use egress or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jul 1, 2026
    Permit
    Mechanical Systems · Modifications to existing HVAC system. No change in use, egress or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jun 29, 2026
    Permit
    General Construction · General construction proposed at existing PA space at the second floor. No change to Use, Egress, or Occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jun 24, 2026
    Permit
    General Construction · Office interior renovation including new offices and meeting rooms. New fishes and lighting throughout
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jun 18, 2026
    Permit
    Mechanical Systems · Addition and modifications to existing HVAC system and related ducts and piping. No change in use, egress or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)