Changing 3 small panels 125 amps, from Challenger to Leviton 30 space due to insurance demands. No new circuits, adding surge protectors each. Main Disconnect is EXTERNAL at meter pack. these are sub panels. · Electrical
Changing 3 small panels 125 amps, from Challenger to Leviton 30 space due to insurance demands. No new circuits, adding surge protectors each. Main Disconnect is EXTERNAL at meter pack. these are sub panels. · Electrical
No product keyword matched · Seattle electrical permits
ATS with a 10KW Generator being added, main disconnect per 2023 NEC code, new grounding/bonding/2x ground rods tie ATS into main 200 amp panel. · Electrical
No product keyword matched · Seattle electrical permits