Seattle City Light EV charging project at the U-District Library (City-owned, PO 0000034252). Lumank Inc. is installing three (3) Level 2 EV chargers (Control Module 3704 AutoCoil, 40A / 9.6 kW, 208-240V single-phase, J1772) on owner-furnished poles/foundations, connected to three (3) 50A branch circuits. 50A breakers supplied and installed by the library's contractor. Scope also includes grounding electrode (ground rods) and an owner-furnished emergency-stop system (Schneider wireless push but · Electrical
Seattle City Light EV charging project at the U-District Library (City-owned, PO 0000034252). Lumank Inc. is installing three (3) Level 2 EV chargers (Control Module 3704 AutoCoil, 40A / 9.6 kW, 208-240V single-phase, J1772) on owner-furnished poles/foundations, connected to three (3) 50A branch circuits. 50A breakers supplied and installed by the library's contractor. Scope also includes grounding electrode (ground rods) and an owner-furnished emergency-stop system (Schneider wireless push but · Electrical
No product keyword matched · Seattle electrical permits
Installation of one (1) pole-mounted Level 2 EV charger for Seattle City Light (SCL) at the Mini-Mart City Park location in Georgetown. The scope is based on SCL Concept Drawing XF9239-401, SCL Construction Standard 0098.71 (EV Chargers on Steel Poles), the Valmont pole submittal drawing 666346-P1 Rev A, the SDOT site plan, and follow-up clarification from SCL. [C.Kenefick 9/18/2026 - 100a service added.] · Electrical
No product keyword matched · Seattle electrical permits