This is a joint venture w/ SHJ Electric to install a new Dedicated Function Fire Alarm/Sprinkler Monitoring System. 3 Sprinkler Riser Rooms, pull station and waterflow bell at each riser room. No occupant notification in the building, other than a single horn/strobe at the FACP. · Electrical
No product keyword matched · Seattle electrical permits
This is a joint venture w/ Sunlight Electric. This project is to modify the existing fire alarm system occupant notification per the changes within the Club Pilates tenant improvement. No new detection is being added. · Electrical
No product keyword matched · Seattle electrical permits
This is a joint venture permit w. Nelson Electric (the installation contractor) and Point Monitor (Fire Alarm Supplier). Adding 3 new speaker/strobes at the new demising wall separating the IMAX theater from the Pac Sci Center. · Electrical
No product keyword matched · Seattle electrical permits
This is a joint Venture w/ OEG Electric, who is the installation contractor. This is to add a new fire sprinkler waterflow bell to the main building at the FDC Connection · Electrical
No product keyword matched · Seattle electrical permits
Modifications to existing fire alarm system to match the revised floor plans in the tenant improvement. No changes tot he existing shaft pressurization of FAS riser. Joint venture with H&M Electric. · Electrical
No product keyword matched · Seattle electrical permits