Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/Securitas Technology
Back to prospects

Securitas Technology

SEATTLE, WA · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 8 / 20Tier B
Keyword
Seer chat
2 / 5
0 keyword-matching signals in the last 90 days.
Freshness5 / 5Latest signal is within 30 days.
Place0 / 5WA is outside the seller’s region and target regions.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
Securitas Technology
Source for Company (opens in new tab)
Signal source
Seattle electrical permits
Signal date
Oct 16, 2026
Source for Signal date (opens in new tab)
Signal count
21 saved signals, 16 in the last 90 days
Signal summary
The proposed work consists of upgrading an existing commercial intrusion/security alarm system. The existing control panel will be upgraded to a Bosch B8512 using a B600 upgrade module, with a B444 cellular communicator added for cellular backup communication. Existing field devices and wiring will remain in place and be reused. Existing keypads will be replaced with B930 keypads, with a new keypad and associated wiring installed in the receiving area if one is not currently present. New interc · Electrical
Source for Signal summary (opens in new tab)
Address
Not found
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

21 signals
  • Oct 16, 2026
    Permit
    The proposed work consists of upgrading an existing commercial intrusion/security alarm system. The existing control panel will be upgraded to a Bosch B8512 using a B600 upgrade module, with a B444 cellular communicator added for cellular backup communication. Existing field devices and wiring will remain in place and be reused. Existing keypads will be replaced with B930 keypads, with a new keypad and associated wiring installed in the receiving area if one is not currently present. New interc · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Oct 13, 2026
    Permit
    Commercial low-voltage intrusion alarm system upgrade for Bridgestone Americas Inc. Installation and integration of one (1) Resideo/Honeywell LTEM-XV LTE cellular communicator to the existing security control panel, including power connection, SIM activation, signal testing, and system programming. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Oct 13, 2026
    Permit
    Install one (1) LTEM-XV LTE cellular communicator for an existing commercial low-voltage intrusion alarm system. Work includes mounting the communicator, connecting to power, integrating with the existing alarm system, SIM activation, programming, and communication testing. No structural modifications or new branch circuits are included. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Oct 13, 2026
    Permit
    Provide and install additional wireless security devices as part of an upgrade to the existing security system. The existing security control equipment will remain in place. Work includes installation of one wireless signal repeater, three motion sensors, two door contact sensors, and two glass-break sensors in designated areas of the facility. All devices will be connected to the existing security system and tested for proper operation. [10/13/26 BGO - Plan Review waived] · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Oct 13, 2026
    Permit
    Commercial low-voltage security system upgrade including installation of a 14-door access control controller, card reader door upgrades, security devices, and Cisco-provided cameras. Includes interface connection to the existing Fire Control System per Cisco requirements. [10/13/26 BGO - Approved Security Plan Set] · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Sep 17, 2026
    Permit
    AES Radio Fire Alarm Communication Upgrade Replace existing Bosch fire alarm POTS-based communication pathway with one (1) AES Radio communicator. Install AES communication equipment, antenna, antenna extension cable, and mounting hardware at the existing fire alarm panel location. Program and configure the AES communication account, coordinate activation with the monitoring provider, and test communication with the central station. No changes to existing fire alarm initiating devices, notifica · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Sep 17, 2026
    Permit
    Replace existing Bosch fire alarm POTS-based communication pathway with one (1) AES Radio communicator. Install AES communication equipment, antenna, antenna extension cable, and mounting hardware at the existing fire alarm panel location. Program and configure the AES communication account, coordinate activation with the monitoring provider, and test communication with the central station. No changes to existing fire alarm initiating devices, notification appliances, or fire alarm control pane · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Sep 8, 2026
    Permit
    Install one cellular communicator on the wall next to the existing Vista fire alarm panel to replace POTS lines · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Sep 2, 2026
    Permit
    This includes changes to security devices, access controls, monitoring systems, policies, or procedures. Proper coordination and review will help maintain compliance, minimize risks, and ensure the security solution continues to meet operational needs. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Aug 31, 2026
    Permit
    Securitas Technology will provide and install:  (1) Vista21IP kit with cell and keypad (battery also included). Panel and cell to be installed in IT closet in office. Keypad to be installed at north main entrance.  (1) additional wireless keypad to be installed at the south man door entrance.  (1) Siren to be installed just outside of the offices.  (2) Wireless glass break sensors to be installed in the future will call area near the "wall of windows"  (4) Overhead door contacts · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Aug 26, 2026
    Permit
    Securitas will replace the panel with a new DMP XT-30 panel, reconnect existing 8 hardwired zones, and replace 5 aged smoke detectors connected to the system with new ones. 2 new alpha numeric wired keypads will replace existing in bedroom and lower level. New system will connect with monitoring center from cellular communicator Securitas will provide and install the following: 1. DMP XT-30 Security Panel 2. DMP LTE cellular communicator 3. 5 hardwired smoke detectors 4. 2 hardwired alp · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Aug 25, 2026
    Permit
    Tech to reference New Store Installation Documents. IF YOU DON'T HAVE A COPY REQUEST ONE 3) If camera licenses are to be ordered. Use SN of the NVR provided in this scope. a) Order licenses from Genetec using SN provide b) Have SES Video Triage team remotely load camera license before scheduling work. c) 844-483-2437 Option 4, 1, 3 OR STBUXESTriage@securitases.com d) If SN is not provided reach out to SES Video Triage team at number and email above to get SN. 4) If NVR is being s · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Aug 25, 2026
    Permit
    Tech to reference New Store Installation Documents. IF YOU DON'T HAVE A COPY REQUEST ONE 3) If camera licenses are to be ordered. Use SN of the NVR provided in this scope. a) Order licenses from Genetec using SN provide b) Have SES Video Triage team remotely load camera license before scheduling work. c) 844-483-2437 Option 4, 1, 3 OR STBUXESTriage@securitases.com d) If SN is not provided reach out to SES Video Triage team at number and email above to get SN. 4) If NVR is being s · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Aug 25, 2026
    Permit
    Modify the existing fire alarm system monitoring communication path from the existing telephone-line communication method to sole-path cellular communication. Install one new StarLink cellular communicator with associated power supply, battery, and required components. Connect the communicator to the existing fire alarm system and central monitoring station. No replacement of the existing fire alarm control panel or field devices. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Aug 25, 2026
    Permit
    Modify existing fire alarm monitoring system by replacing the existing phone-line communication path with a sole-path cellular communication path. Furnish and install new cellular communicator, power transformer, battery, and associated components. Existing SK 5208 fire alarm control panel to remain. No replacement or major modification of the existing fire alarm control panel. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Aug 25, 2026
    Permit
    Modify existing fire alarm monitoring system by replacing the existing phone-line communication path with a sole-path cellular communication path. Furnish and install new cellular communicator, power transformer, battery, and associated components. Existing SK 5208 fire alarm control panel to remain. No replacement or major modification of the existing fire alarm control panel. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • May 7, 2026
    Permit
    Add (1) additional 24 Port Smart Switch, Install (6) Hanwha XND-6083RV IP Interior Cameras, Install (5) Hanwha IP Interior White BOX Cameras/Wall Mounted, Install (2) Verint IP Height Strip Cameras, Install (2) ViewZ IP PVM Cameras, Install (1) Verint 360 Camera, Install (2) Hanwha XNV-C6083R IP Exterior Cameras · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • May 1, 2026
    Permit
    Upgrade existing Edge VR300T 8TB DVR, Install (7) Hanwha XND-6083RV IP Interior Cameras, Install (1) Verint IP Height Strip Camera, Install (1) ViewZ IP PVM Camera, Install (1) Verint 360 Camera, Install (6) Hanwha XNV-C6083R IP Exterior Cameras, Install (1) Verint IP ATM Transaction Camera · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Apr 21, 2026
    Permit
    Installation of 2 doors of access with strikes, 2 cameras and 1 intercom · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Feb 20, 2026
    Permit
    Low voltage installation to upgrade security system, add three cameras to existing NVR and add two access control doors to existing AC system. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)