Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/CapStone Solutions, Inc.
Back to prospects

CapStone Solutions, Inc.

SEATTLE, WA · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 5 / 20Tier C
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness4 / 5Latest signal is within 90 days.
Place0 / 5WA is outside the seller’s region and target regions.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
CapStone Solutions, Inc.
Source for Company (opens in new tab)
Signal source
Seattle electrical permits
Signal date
Oct 9, 2026
Source for Signal date (opens in new tab)
Signal count
5 saved signals, 1 in the last 90 days
Signal summary
Switch 100A 480V power from 1 distribution panel on to Electrical room on bottom floor of Pacific Science Center due to lease change in building. · Electrical
Source for Signal summary (opens in new tab)
Address
Not found
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

5 signals
  • Oct 9, 2026
    Permit
    Switch 100A 480V power from 1 distribution panel on to Electrical room on bottom floor of Pacific Science Center due to lease change in building. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • May 27, 2026
    Permit
    Adding Lumen POTS · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Mar 27, 2026
    Permit
    Adding 100A 480V feeder from 5th floor electrical panel to rooftop AT&T 50kva step down transformer feeding the new 3-bay WUC with 200A panel · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Feb 20, 2026
    Permit
    Cell Site located at SSCC - AT7T to add new 3-bay WUC with factory attached 200A TAS panel and we will take over existing old clearwire service and upgrade from 100A to 200A · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jan 21, 2026
    Permit
    [3/3/26 VR - See also Plan Review Permit 7114596-EL - refund request 4.22.26][4/23/2026 JBC Refunded 200amp Service and added two 60 - 200amp Feeders to Permit] · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)