Plan review for 3 units. SFR and ADU EXISTING, new DADU built in the backyard. 400 amp service is exsting SCL required us to move the service to the DADU and update to a overhead 3 meter pack service and feed the sfr and adu with disconnect at existing building. [9/18/26 BGO - Approved Service to (3) dwellings SFR/AADU/DADU] · Electrical
No product keyword matched · Seattle electrical permits
Renovating kitchen and laundry room to expand kitchen and create new laundry closet and pantry
adding lighting switches and outlets through out · Electrical
No product keyword matched · Seattle electrical permits
We are upgrading the service and installing an exterior subpanel fed from existing main panel to support new exterior electrical loads.
-Bonding around pool and metal planter
-Installing conduit for existing pool light and junction box.
-electrical for hot tub install
-2 heaters for pergola
-EV Charger
-electrical for pool heat pump [9/17/2026 PGF Voided 200A service fee and added 201-399A to permit per contractor request. Post-issuance change fee included.] · Electrical
No product keyword matched · Seattle electrical permits
rewire for duplex. adding new appliance receptacles, outlets, switches, and fixtures throughout. new panel and service,like for like
Ground floor unit:
1902 NE 65th St, Seattle, WA 98115
Second floor unit:
6500 19th Ave NE, Seattle, WA 98115 · Electrical
No product keyword matched · Seattle electrical permits
New construction of two story dadu, garage below. service will potentially be located on exist SFR/AADU (12156 12TH AVE NW) existing 400-amp service · Electrical