Adding a panel in the shed for a kiln and an EV charger. Repurposing the conduit (1") previously used for the EV charger and now being used to power a 100 amp panel. We will run the EV Charger and the Kiln off of this panel. · Electrical
No product keyword matched · Seattle electrical permits
We are replacing all of the kitchen circuits with new circuits. We are replacing the master bathroom circuits. We are adding two new bathroom circuits. We are replacing all of the lighting circuits in the upstairs. · Electrical
No product keyword matched · Seattle electrical permits
Moving some can lights in the basement as well as wiring a new bathroom outlet and changing the location of the hot water heater, washer and dryer. · Electrical
No product keyword matched · Seattle electrical permits
We installed a 48Amp Wallbox EV Level 2 charger about 65' away from the panel. House is close to capacity so we installed a controller in the bottom of the panel to shut off the EV Charger when the house power approaches 200 amps. It was purchased from Wallbox specifically for this purpose. · Electrical
No product keyword matched · Seattle electrical permits
Project description
I am swapping a 125 Amp panel for a 125 amp panel with more spaces. We are also adding a circuit for a heat pump that needs a 45 amp breaker. · Electrical
No product keyword matched · Seattle electrical permits