Replace 200a amp Main Breaker Panel
Install 200 Amp Disconnect.
install conduit along the exterior side of Janet's house to route the new service feeder to the meter. · Electrical
No product keyword matched · Seattle electrical permits
Service Change, This solution is to disconnect the meter and properly secure it to the home
We will also be installing an emergency disconnect at the service equipment between the meter and panel · Electrical
No product keyword matched · Seattle electrical permits
- Remove Old Panel: Safely disconnect power and remove the existing aluminum panel.
- Install New Copper Panel: Install a new 100A main panel with Fireguard and Shockguard circuit breakers.
- Replace All Plugs & Switches: Replace all interior and exterior outlets and switches with new, high-quality devices. Upgrade all connections using the solid-state "pigtailing" method. Install code-required weatherproof "in-use" covers on all exterior outlets. · Electrical
No product keyword matched · Seattle electrical permits
Run a new dedicated home run to restore power to the basement bedroom circuit. This includes installing new wiring from the electrical panel to the basement bedroom · Electrical
No product keyword matched · Seattle electrical permits
Build and install a 200amp temp pole with a breaker meter base using rigid conduit for installation in Seattle. This will include 2 60amp plugs and 2 120v standard outlets · Electrical
No product keyword matched · Seattle electrical permits
Install a 40-50a dedicated circuit up to 20 ft from the electrical panel. Includes AFCI and / or GFCI protection if required by code. for induction oven · Electrical
No product keyword matched · Seattle electrical permits
Run a new circuit for a hardwired EV Charger
-Circuit will run along exterior in conduit
-Circuit will power a customer provided level 2 EV charger · Electrical
No product keyword matched · Seattle electrical permits
Install Whole Home Surge Protector
Disconnect circuit for recirc pump
Replace or install new GFCI outlets
-2 in kitchen
-4 in basement
-4 on exterior
Run new circuit for dryer
-GFCI Breaker
-Grounded wiring
-Grounded cord
Replace keyless socket in basement[7/22/2026 JBC Added additional branch circuits to permit] · Electrical
No product keyword matched · Seattle electrical permits
Relocate the wires to make space for the beam to be sistered in the bathroom ceiling
Relocate wire for the bedroom outlets to get the wire out of the beam · Electrical
No product keyword matched · Seattle electrical permits
"Replace 200a amp Main Breaker Panel, Replace 50a RV Outlet w/ weather proof enclosure, Install a 40-50a dedicated circuit up to 20 ft from the electrical panel. Includes AFCI and / or GFCI protection." - [CJK 5/14/2026 - Scope of work updated.] · Electrical
No product keyword matched · Seattle electrical permits
We will completely replace the outdated wiring in the basement to meet current electrical codes. We will install additional outlets throughout the area to eliminate the need for extension cords and meet modern spacing requirements.To prevent overloads and flickering lights, we will split the existing basement load into three dedicated circuits:
1. Guest Suite: Dedicated power for the bedroom and bathroom lighting.
2. Gathering Room: Independent power for the main living area and outl · Electrical
No product keyword matched · Seattle electrical permits