Adding (1) 100amp feeder from main house panel to detached shed unit. Adding 100amp sub-panel with grounding and bonding. Adding outlet and lighting circuits from sub-panel in small shed unit. · Electrical
No product keyword matched · Seattle electrical permits
Partial rewire of house, Replace service meter with disconnecting service meter 200amps- re-feed existing panel that is already rated for 200amps. · Electrical
No product keyword matched · Seattle electrical permits
Replacing the current 100amp service meter with 200amp overhead service meter/panel combination, converting main 100amp house panel to a sub-panel, adding a circuit for the greenhouse and adding a NEMA 14-50 for the car port. · Electrical
No product keyword matched · Seattle electrical permits
Replacing 200amp panel with new 200amp panel. Original panel was compromised from water damage and had visible rust throughout the panel. no additional load to be added. · Electrical
No product keyword matched · Seattle electrical permits
Complete rewire of single family residence with 200amp service and 200amp panel. LVL 2 50amp NEMA 14-50 installed in garage.
Seattle City Light Service Application ID: 1000529801
ESR
Jonathan Alvarado · Electrical
No product keyword matched · Seattle electrical permits