Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/Blessed Electrial
Back to prospects

Blessed Electrial

SEATTLE, WA · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 5 / 20Tier C
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness4 / 5Latest signal is within 90 days.
Place0 / 5WA is outside the seller’s region and target regions.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
Blessed Electrial
Source for Company (opens in new tab)
Signal source
Seattle electrical permits
Signal date
Aug 20, 2026
Source for Signal date (opens in new tab)
Signal count
5 saved signals, 1 in the last 90 days
Signal summary
basement rewire adding 6 circuits 15-30 amp 1 circuit for a sub panel 125 amp · Electrical
Source for Signal summary (opens in new tab)
Address
Not found
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

5 signals
  • Aug 20, 2026
    Permit
    basement rewire adding 6 circuits 15-30 amp 1 circuit for a sub panel 125 amp · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Aug 11, 2026
    Permit
    I have approval from SCL to relocate a power pole on my property that services 10008 Rainier Ave S, Seattle, WA 98178. This will require modifying the existing surface to be run underground from the new power pole location. In addition, to running service underground we would like revise the meter base and disconnect location and install a new one at the new location. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • May 12, 2026
    Permit
    rewire garage with 5 circuits · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • May 7, 2026
    Permit
    adding power to the shield a 5 circuit · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Dec 30, 2025
    Permit
    New 100amp sub panel 4 new circuits 120 · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)