Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/SeaTac Electric
Back to prospects

SeaTac Electric

SEATTLE, WA · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 4 / 20Tier C
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness3 / 5Latest signal is within 180 days.
Place0 / 5WA is outside the seller’s region and target regions.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
SeaTac Electric
Source for Company (opens in new tab)
Signal source
Seattle electrical permits
Signal date
Jul 14, 2026
Source for Signal date (opens in new tab)
Signal count
5 saved signals, 0 in the last 90 days
Signal summary
Interior electrical modifications to support auditorium renovations, including revised lighting layouts, new lighting controls, new power connections to seating, equipment relocations, and associated wiring changes. Work includes updates to emergency egress lighting, aisle lighting, exterior signage power, and distribution adjustments as shown. No new service, no panelboard replacements, and no structural work are proposed. [3/24/26 KEF - Plan set conditionally approved pending EC assignment.] · Electrical
Source for Signal summary (opens in new tab)
Address
Not found
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

5 signals
  • Jul 14, 2026
    Permit
    Interior electrical modifications to support auditorium renovations, including revised lighting layouts, new lighting controls, new power connections to seating, equipment relocations, and associated wiring changes. Work includes updates to emergency egress lighting, aisle lighting, exterior signage power, and distribution adjustments as shown. No new service, no panelboard replacements, and no structural work are proposed. [3/24/26 KEF - Plan set conditionally approved pending EC assignment.] · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jun 1, 2026
    Permit
    New classroom building on existing property. New SCL electrical service will feed new building. LED lighting throughout. [6/1/2026 BGO - Approved Plan Set] · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Apr 7, 2026
    Permit
    Tenant Improvement [1/5/26 KEF - Plan set approved.] [4/7/26 KEF - Permit issued. EC assigned.] [9/17/26 KEF - Inspections added for after hours service repair.] · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Feb 6, 2026
    Permit
    Interior alternations of approximately 1600 sf on Level 2 of the University of Washington Medical Center Montlake Campus to upgrade existing diagnostic computed tomography equipment and outpatient space to perform image guided procedures. Renovations include selective demolition and interior remodel to reconfigure entry, equipment closet, control, staff work areas and the procedure room. Localized modifications of the existing Electrical, HVAC, Plumbing and Medical gas systems are requir · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Dec 18, 2025
    Permit
    TI OF EXISTING STRUCTURE FLOORS 1&3. WE ARE REPLACING EXISTING LIGHT FIXTURES, AND RE-WORK OF EXISTING POWER IN LOBBY, RESTAURANT/BAR AND SPA AREAS. [12/18/25 BGO - Approved Plan Set] [4/14/26 BGO - Approved Revision] · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)