Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/Mad Dog Electric, Inc
Back to prospects

Mad Dog Electric, Inc

SEATTLE, WA · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 6 / 20Tier C
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness5 / 5Latest signal is within 30 days.
Place0 / 5WA is outside the seller’s region and target regions.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
Mad Dog Electric, Inc
Source for Company (opens in new tab)
Signal source
Seattle electrical permits
Signal date
Oct 22, 2026
Source for Signal date (opens in new tab)
Signal count
12 saved signals, 7 in the last 90 days
Signal summary
Disconnect and reconnection of a Disposal, changing whip on disposal in Unit 402 · Electrical
Source for Signal summary (opens in new tab)
Address
Not found
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

12 signals
  • Oct 22, 2026
    Permit
    Disconnect and reconnection of a Disposal, changing whip on disposal in Unit 402 · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Oct 9, 2026
    Permit
    Adding a temp pole for temporary power · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Oct 8, 2026
    Permit
    We are removing old service and connecting temporary power · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Sep 26, 2026
    Permit
    Electrical conduit to main house and DADU. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Sep 22, 2026
    Permit
    Replacing Switches, Outlets and Can lights · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Sep 10, 2026
    Permit
    Replace Fan heater combo in Bathroom, Add switch leg for 2 vanity lights, add power to single pole switch · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Aug 21, 2026
    Permit
    We are upgrading the Service from 200 amps to 320 amps · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Aug 12, 2026
    Permit
    Inspection For Final, Permit References OTC SFR 7124311-EL OTC AADU 7124309-EL  OTC DADU 7124295-EL[CF 8/17/2026 - Permit pulled to complete trim and feeders of DADU by new contractor. Letter of EC contractor change uploaded to documents folder of this permit. See 7157931-EL for SFR/AADU takeover permit.] · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Aug 10, 2026
    Permit
    We are Installing all the finish devices/trim work on all units need to get it inspected for final inspection For ADU 6206[CF 8/17/2026 - Permit pulled to complete trim and feeders of SFR/AADU by new contractor. Letter of EC contractor change uploaded to documents folder of this permit. See 7157931-EL for DADU takeover permit.] · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • May 11, 2026
    Permit
    I am repairing an existing 1/2 conduit that is ran from their backyard to their Dock that has an existing 20 AMP outlet we will be providing GFCI protection for the circuit. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Feb 3, 2026
    Permit
    need to install service for new triplex and move existing fiveplex meters to make 10 stack meter base on tripex. 3 new meters for triplex at 125AMPs and existing fiveplex 5 meters at 100AMPs, one 50 amp house panel for both the fiveplx and tripplex with sump pmps. Inspections for wall cover and underground pipe cover passed under defferent Permits. will need inspections for Service, Feeders and Final. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Dec 2, 2025
    Permit
    Need to Upgrade service from 120 AMP service to 200 AMP service, Need to change location of Meter and Panel, adding a sub panel in basement, adding 3-4 circuits to kitchen · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)