Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/Haggard Electrical Contractors
Back to prospects

Haggard Electrical Contractors

SEATTLE, WA · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 6 / 20Tier C
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness5 / 5Latest signal is within 30 days.
Place0 / 5WA is outside the seller’s region and target regions.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
Haggard Electrical Contractors
Source for Company (opens in new tab)
Signal source
Seattle electrical permits
Signal date
Oct 20, 2026
Source for Signal date (opens in new tab)
Signal count
11 saved signals, 4 in the last 90 days
Signal summary
System for new Mixed-Use project · Electrical
Source for Signal summary (opens in new tab)
Address
Not found
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

11 signals
  • Oct 20, 2026
    Permit
    System for new Mixed-Use project · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Oct 16, 2026
    Permit
    WEST BUILDING PORTION FOR CONSTRUCTION OF A NEW EIGHT STORY, APPROXIMATELY 949,098 SF, MIXED-USE PROJECT CONSISTING OF THREE 6 STORY RESIDENTIAL BUILDINGS WITH A TOTAL OF 796 RESIDENTIAL APARTMENT UNITS OVER A 2 STORY COMMON PODIUM BUILDING CONTAINING APPROXIMATELY 25,946 SF OF COMMERCIAL RETAIL SPACE AND PARKING FOR 681 CARS · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Sep 18, 2026
    Permit
    revision to issued permit 7080791-EL: Added damper at the East end of L2 corridor (FA1.16) and updated FFSCP graphic (FA4.01) · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Sep 2, 2026
    Permit
    DAS system for new residential building · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • May 15, 2026
    Permit
    Fire Alarm system for a new Mixed-Use apartment building consisting of 186 units · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Apr 1, 2026
    Permit
    All electrical work including low voltage related to the construction of a new mixed-use project consisting of 3 residential buildings with a total of 796 apartments. (Fire Alarm under separate permit) [4/1/26 BGO - Approved Plan Set with Comments] **11/4/26 KEF - EC is submitting revised drawings. Placed into Corrections Required for document submittal.** · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Mar 16, 2026
    Permit
    Installing limited energy wiring between floors for the trash chute on behalf of Independent Chute Company as requested by the Electrical Inspector · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Feb 3, 2026
    Permit
    INSTALLATION OF A NEW MANUAL AND AUTOMATIC FIRE ALARM SYSTEM IN A NEW BUILDING. NEW FIRE ALARM PANEL IS BEING INSTALLED ALONG WITH NOTIFICATION DEVICES AS PER THE APPLICABLE CODES. SPRINKLER WATERFLOW SWITCH IS BEING MONITORED TO ACTIVATE NOTIFICATION DEVICES UPON ALARM 7/29/25 Get Started renewal. get started renewal 09/29/25 ndm · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Dec 9, 2025
    Permit
    PS DAS system for new construction mixed use building · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Dec 5, 2025
    Permit
    CONSTRUCTION OF ONE NEW MIXED-USE APARTMENT BUILDING CONSISTING OF 186 APARTMENT UNITS ON 4-5 LEVELS ABOVE GROUND LEVEL SHELL RETAIL SPACES AND 2 BELOW GRADE DAYLIGHT BASEMENT LEVELS. TYPE OF CONSTRUCTION FOR THE UPPER 4-5 STORIES IS TYPE V-A. TYPE OF CONSTRUCTION FOR THE LEVELS BELOW THE 3-HR PODIUM IS TYPE I-A. BUILDING WILL CONNECT TO ADJACENT BUILDING M2 (UNDER SEPARATE PERMIT) VIA A BRIDGE AT LEVEL 4 · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Dec 2, 2025
    Permit
    Temporary power for construction of a new mixed-use project consisting of three residential buildings Renewed - 12/02/2027 FR · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)