the wind blown down the service drop, so I install a new meterbase combo, new feeder wires, 2 new ground rods if require, bond the cold water pipe to first disconnect mean[8/6/2026 JBC Added to Service Fee to permit and credited Feeder Fee.] · Electrical
the wind blown down the service drop, so I install a new meterbase combo, new feeder wires, 2 new ground rods if require, bond the cold water pipe to first disconnect mean[8/6/2026 JBC Added to Service Fee to permit and credited Feeder Fee.] · Electrical
No product keyword matched · Seattle electrical permits
I redo the warter heater circuit. It was 20 A and used AWG 12 MC cable. I piped it and ran awg 10 wires with 30 A 2 pole breaker. I Installed GFCI to GFCI outlet 2 in the meat cutter work area. It was regular receptacle and was neutral and hot reversed. redo the piping for it. Installed a new 20 A circuit for AC service which is 24 feet within the AC outside. I totally redo the GFCI 1 circuit in the meat cutting area. It was a regualr outlet and use geen wire as a hot, and no grounding at all. · Electrical
No product keyword matched · Seattle electrical permits
add a 15 A receptacle circuit to the basement. Add a 15 A receptacle from the outlet of the bathroom on the first floor to the room next to the bathroom. · Electrical
No product keyword matched · Seattle electrical permits
like-in-kind replace a 1000 w wall heater in the west bedroom, replace the bathroom wall heater with the same unit, new thermost and new wiring, replace the baseborad heater in the east side bedroom with a same one with new thermost and new wiring. The bathroom wall heater and the basebord heater in the east bedroom is in the same circuit · Electrical
No product keyword matched · Seattle electrical permits