Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/Premier Mechanical & Electric
Back to prospects

Premier Mechanical & Electric

SEATTLE, WA · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 6 / 20Tier C
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness5 / 5Latest signal is within 30 days.
Place0 / 5WA is outside the seller’s region and target regions.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
Premier Mechanical & Electric
Source for Company (opens in new tab)
Signal source
Seattle electrical permits
Signal date
Nov 10, 2026
Source for Signal date (opens in new tab)
Signal count
28 saved signals, 5 in the last 90 days
Signal summary
Installation of power and communication wires between the heat pump and AHU's · Electrical
Source for Signal summary (opens in new tab)
Address
Not found
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

28 signals
  • Nov 10, 2026
    Permit
    Installation of power and communication wires between the heat pump and AHU's · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Oct 6, 2026
    Permit
    Adding branch circuit for heat pump · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Oct 5, 2026
    Permit
    Adding construction temporary service. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Sep 14, 2026
    Permit
    Install subpanel in detached garage. Install circuits for EV charger, sauna cold plunge and heat pump. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Aug 19, 2026
    Permit
    Installed a new receptacle to existing branch circuit in basement for a chair lift · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jun 23, 2026
    Permit
    Adding a 2 pole 60-amp circuit for an exterior heat pump, Adding an exterior receptacle, Running TC cable from outdoor unit to branch box in attic, from branch box to head downstairs. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jun 15, 2026
    Permit
    Installing (1) exterior branch circuit to a new outdoor receptacle in the yard · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jun 9, 2026
    Permit
    Upgrade panel to 125 amp. Add 6 circuits for new water heater, kitchen, and general (under 30 amps) Add 1 50 amp circuit for oven. Modifying Dryer circuit to bring up to code. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • May 18, 2026
    Permit
    Replacing existing older load center with a new one. Adding a heat pump circuit with a service outlet. Panel ampacity remains at 200A · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • May 14, 2026
    Permit
    Installing a ductless 1 to 1, power and control wiring · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • May 13, 2026
    Permit
    Remodel of kitchen and primary bath with small addition. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • May 13, 2026
    Permit
    Control/power wire for indoor fan coils · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • May 12, 2026
    Permit
    Adding furnace circuit in garage and heat pump circuit. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • May 5, 2026
    Permit
    Control/power wire from the AHU to the outdoor unit for ADU · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • May 4, 2026
    Permit
    Temporary service · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Apr 24, 2026
    Permit
    Installation of new 200A loadcenter while removing an existing 150A loadcenter. Relocating to opposite side of existing 400A CT cabinet. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Apr 13, 2026
    Permit
    Install 125 amp load management panel in carport. Take over project from previous electrical contractor to obtain final inspection on project. [CJK 4/13/2026 - see also permits 6819491(work by Bowie Electric-some Covers); 6754853 (Ufer&temp); 6973836 (Service), 7084802.] · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Apr 10, 2026
    Permit
    Install new ductless heat pump circuit. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Mar 31, 2026
    Permit
    Adding subpanel, feeder to new detached garage with EV charger. Wiring of new second floor addition. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Mar 31, 2026
    Permit
    Adding feeder for new accessory building, wiring of building and installing power for permanent spa. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)