26D5E36674 - Providence Mt St Vincent - Courtyard Access Point Additions.
Pavion will provide and install the required access control equipment to add (2) new access-controlled openings within the courtyard area of the Mount St. Vincent facility. · Electrical
26D5E36674 - Providence Mt St Vincent - Courtyard Access Point Additions.
Pavion will provide and install the required access control equipment to add (2) new access-controlled openings within the courtyard area of the Mount St. Vincent facility. · Electrical
No product keyword matched · Seattle electrical permits
26D5E34444 - UW - HSC-T - Crest Remodel.
Crest Remodel Project
293K Path to reader will be rerouted. Pull cables utilizing path to reader into 12x12 service located in 293J
HST-293A, 293F, 293L. Doors are being removed. Recover devices and demo cable.
HST-293-ICR/OCR Remove devices Temporary, door to be remodeled, remove out reader. Pull in new composite and 22/8 for new door location.
293M Devices were previously recovered. Demo cable located above hatch
Cabling to be pulled back to and r · Electrical
No product keyword matched · Seattle electrical permits
26D5E29182 - UW - Kane Hall - 208570 CAAMS Upgrades Project
Install access controls and control cabling to Kane Hall building, Install 5 ACS panel, install PIMs, ADA door package, lockdown buttons. · Electrical
No product keyword matched · Seattle electrical permits
26D5E03512 - UW - SOM - HSC Deans Office Nobel Medal Alarm
Pavion will configure and install 1ea EA-728V alarm unit to a display case installed by others.
Pavion will install 6ea surface mount contacts in Nobel prize display.
Pavion will install 2ea shock sensors in Nobel prize display. · Electrical
No product keyword matched · Seattle electrical permits
26D5E04546 - UW - Burke Museum - Hardwire DR314 Zone
install (1) recessed door contact and hardwire it back to the 307C Security room with an existing input module. · Electrical
No product keyword matched · Seattle electrical permits