Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/Cochran Electric
Back to prospects

Cochran Electric

SEATTLE, WA · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 6 / 20Tier C
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness5 / 5Latest signal is within 30 days.
Place0 / 5WA is outside the seller’s region and target regions.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
Cochran Electric
Source for Company (opens in new tab)
Signal source
Seattle electrical permits
Signal date
Oct 16, 2026
Source for Signal date (opens in new tab)
Signal count
13 saved signals, 4 in the last 90 days
Signal summary
Tenant Improvement on 14th floor adds new phone booths. (12) new notification supported by existing infrastructure. · Electrical
Source for Signal summary (opens in new tab)
Address
Not found
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

13 signals
  • Oct 16, 2026
    Permit
    Tenant Improvement on 14th floor adds new phone booths. (12) new notification supported by existing infrastructure. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Oct 16, 2026
    Permit
    Tenant improvement on level 12 of existing high rise bldg. Existing EST 3 w/ voice notification to remain. Adding (12) notification devices to support new phone booths. Existing NAC and amps to support new devices. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Oct 1, 2026
    Permit
    We are replacing the BDA, BBU, and donor antenna. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Aug 28, 2026
    Permit
    Update to permit 7137050-EL. Adding 1 more flame detector and monitor modules in bike cage for a total of 3. 1 flame detector in storage room also. Adding 1 more NAC panel for a total of 2. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • May 21, 2026
    Permit
    K-wing Electrical permit · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • May 5, 2026
    Permit
    J00292511 - 4 flame detectors in E-Bike Charging area on level P4, with 2 new NAC power supplies and terminal can with monitor modules. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • May 5, 2026
    Permit
    J00292510 - 3 new flame detectors for E-Bike charging locations on level P2 and NAC booster. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • May 5, 2026
    Permit
    J00292494 - 2 new flame detectors in E-Bike charging area on level P1 with NAC panel. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Apr 10, 2026
    Permit
    Joint venture with Cochran (J00287935) Building permit #7123909-CN. Level 23 buildout. Existing EST3 addressable fire alarm system with voice evacuation remaining. Existing NAC devices and wiring to be removed unless noted. New devices to be installed and supported by existing power supplies and speaker circuits on lv. 23. Relays to be installed for turnstile release. One new duct detector and relay for FSD shutdown to be installed. Two existing smoke detectors to be relocated and two additiona · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Mar 12, 2026
    Permit
    Adding control relay for turnstile override. Phone booths in copy area · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jan 12, 2026
    Permit
    Existing EST3 addressable fire alarm system with voice notification. Existing NAC wiring on level 17 to be removed except where noted. All existing NAC devices to be removed. Shell and core devices to be replaced with new like-for-like notification devices. New notification devices outside the shell and core to be provide to support new room layout. Existing power supplies and speaker circuits to support new notification devices. Four new smoke detectors and new releasing module to be provided · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Dec 16, 2025
    Permit
    4th floor TI. Adding speaker/strobes to the Restrooms and Lab OPS area. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Nov 19, 2025
    Permit
    We are installing (1) control relay. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)