Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/Staudt Electric
Back to prospects

Staudt Electric

SEATTLE, WA · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 6 / 20Tier C
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness5 / 5Latest signal is within 30 days.
Place0 / 5WA is outside the seller’s region and target regions.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
Staudt Electric
Source for Company (opens in new tab)
Signal source
Seattle electrical permits
Signal date
Oct 21, 2026
Source for Signal date (opens in new tab)
Signal count
10 saved signals, 1 in the last 90 days
Signal summary
adding 4 ckts. 1 for transfer fan, 3 for wall coolers. 3 x 2-pole 20A, 1 1-pole 20A for the transfer fan. · Electrical
Source for Signal summary (opens in new tab)
Address
Not found
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

10 signals
  • Oct 21, 2026
    Permit
    adding 4 ckts. 1 for transfer fan, 3 for wall coolers. 3 x 2-pole 20A, 1 1-pole 20A for the transfer fan. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Aug 12, 2026
    Permit
    HVAC upgrades to historical building. Electrical to accommodate as well as some lighting changes. Will include a 28 kW phase converter for HVAC condenser, given that power to the building is 240V 1-phase and the condenser requires 3-phase power. Other things include new panel for HVAC loads and relocation of existing panel in basement. [8/12/26 BGO - Approved Plan Set] · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Feb 16, 2026
    Permit
    FACP swap, 120V. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Feb 4, 2026
    Permit
    Hood motor to shut down upon activation of Ansul Control Head Lights to shut down upon activation of Ansul Control Head. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Dec 8, 2025
    Permit
    Demo and connections for new security system. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Dec 8, 2025
    Permit
    Termination and trim out of security devices. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Dec 5, 2025
    Permit
    Make up air to shut down. Exhaust fan to turn on all electrical appliance under hood to shut off. Gas valve to close. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Dec 5, 2025
    Permit
    Oven power is not shutting down when fire system activates · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Nov 19, 2025
    Permit
    Install gas reset relay. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Nov 19, 2025
    Permit
    Install contactor controlled by ansul for kitchen appliances. [1/16/2026 PGF Changed address from 401 9th Ave N. to 400 9th Ave N.] · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)