Changing Panel 200 amp[CF 1/27/2026 This permit is for 200A panel swap and GEC work only. Inspector noticed EV charger and AC system, contractor states they did not install. EV charger and AC system appear to have been installed previously without permits or inspections] · Electrical
No product keyword matched · Seattle electrical permits