Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/Convergint
Back to prospects

Convergint

SEATTLE, WA · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 5 / 20Tier C
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness4 / 5Latest signal is within 90 days.
Place0 / 5WA is outside the seller’s region and target regions.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
Convergint
Source for Company (opens in new tab)
Signal source
Seattle electrical permits
Signal date
Oct 6, 2026
Source for Signal date (opens in new tab)
Signal count
10 saved signals, 3 in the last 90 days
Signal summary
Adding module to monitor kitchen hood suppression system · Electrical
Source for Signal summary (opens in new tab)
Address
Not found
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

10 signals
  • Oct 6, 2026
    Permit
    Adding module to monitor kitchen hood suppression system · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Oct 6, 2026
    Permit
    Convergint to install cellular monitoring unit as means to monitor fire alarm system · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Sep 10, 2026
    Permit
    Decommissioning AES radio and replacing with a new cellular monitoring unit (Telguard) · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jul 7, 2026
    Permit
    Adding 10 Card Readers for access control, intercom, some cameras · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jun 9, 2026
    Permit
    Decomission point in fire alarm program and remove module previously monitoring pre action system (decomissioned and reconnected to wet system by Mckinstry) · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • May 26, 2026
    Permit
    Running new wire to connect working nanostation to offline nanostation to reestablish security camera connection; estimated 150-200ft run · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • May 11, 2026
    Permit
    Relocation of four (4) existing CCTV cameras from the 7th floor to new locations on the 6th floor, including extension and re-termination of associated low-voltage cabling. Install one (1) access control reader at 5th floor Storage Room 510. Utilizing existing security system infrastructure. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • May 4, 2026
    Permit
    Replacing access control and video surveillance system · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jan 13, 2026
    Permit
    Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Nov 17, 2025
    Permit
    Low voltage access control and cctv systems. Convergint parts and smarts, wiring the access control head end LifeSafety Power cabinet with Lenel boards inside for 6 card access doors and 7 door contact only doors, testing and commissioning. All other device installation, wire, pathway, j-boxes, 120VAC, and terminations by others. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)