INSTALLING TWO NEW 400AMP PANELS. INSTALLING SIX EPO BUTTONS. INSTALLING CONDUIT AND WIRE TO SUPPORT 114 FUTURE EV CHARGES. NO CHARGERS WILL BE INSTALLED AT THIS TIME. [7/1/26 KEF - Plan set approved.] · Electrical
No product keyword matched · Seattle electrical permits
Harborview Medical Center West Hospital Fluid Cooler & Aux Cooling Upgrades [4/1/26 KEF - Plan set approved.][6/23/2026 JBC Permit Transfered to Apex Electric Group] [10/8/26 KEF - Revised plans approved. Revised plan set supersedes prior stamped set.] · Electrical
No product keyword matched · Seattle electrical permits
Installing raceway and wire to feed 41 EV Chargers. Installing (3) panels. Installing (2) transformers. Installing (1) shunt trip [1/16/26 KEF - Plan set approved.] [1-23-26 D Rankin - Contractor wants to comply with the 2026 code 625.43 for spacing and shut down via EPO switch to Shunt Trip on EV panel - No Exceptions Taken by DR and SL with markings noting circuits and chargers to be de-energized] [5/6/26 KEF - Revised plans approved. Supersedes prior stamped set.] · Electrical
No product keyword matched · Seattle electrical permits