Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/I5 Electric llc
Back to prospects

I5 Electric llc

SEATTLE, WA · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 5 / 20Tier C
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness4 / 5Latest signal is within 90 days.
Place0 / 5WA is outside the seller’s region and target regions.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
I5 Electric llc
Source for Company (opens in new tab)
Signal source
Seattle electrical permits
Signal date
Sep 13, 2026
Source for Signal date (opens in new tab)
Signal count
3 saved signals, 1 in the last 90 days
Signal summary
We lifted the house and are building out another unit on the level below, the unit on top nothing will change but a 125a panel installed replacing the existing 200 a panel, the lower unit will have a 125a panel and there will be a 125 a house panel I'll be installing a 400 service disconnect and a 3 barrel meter, the lower unit will be wired to meet nec 2026 code · Electrical
Source for Signal summary (opens in new tab)
Address
Not found
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

3 signals
  • Sep 13, 2026
    Permit
    We lifted the house and are building out another unit on the level below, the unit on top nothing will change but a 125a panel installed replacing the existing 200 a panel, the lower unit will have a 125a panel and there will be a 125 a house panel I'll be installing a 400 service disconnect and a 3 barrel meter, the lower unit will be wired to meet nec 2026 code · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Mar 20, 2026
    Permit
    Adding heat pump under home 30a · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Nov 14, 2025
    Permit
    We will be reworking and moving most electrical boxes in kitchen of unit 205, additionally we will be bringing the extended circuitry up to the current NEC code. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)