We lifted the house and are building out another unit on the level below, the unit on top nothing will change but a 125a panel installed replacing the existing 200 a panel, the lower unit will have a 125a panel and there will be a 125 a house panel I'll be installing a 400 service disconnect and a 3 barrel meter, the lower unit will be wired to meet nec 2026 code · Electrical
We lifted the house and are building out another unit on the level below, the unit on top nothing will change but a 125a panel installed replacing the existing 200 a panel, the lower unit will have a 125a panel and there will be a 125 a house panel I'll be installing a 400 service disconnect and a 3 barrel meter, the lower unit will be wired to meet nec 2026 code · Electrical
No product keyword matched · Seattle electrical permits
We will be reworking and moving most electrical boxes in kitchen of unit 205,
additionally we will be bringing the extended circuitry up to the current NEC code. · Electrical
No product keyword matched · Seattle electrical permits