Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/STS Construction Services
Back to prospects

STS Construction Services

SEATTLE, WA · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 6 / 20Tier C
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness5 / 5Latest signal is within 30 days.
Place0 / 5WA is outside the seller’s region and target regions.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
STS Construction Services
Source for Company (opens in new tab)
Signal source
Seattle electrical permits
Signal date
Oct 14, 2026
Source for Signal date (opens in new tab)
Signal count
16 saved signals, 2 in the last 90 days
Signal summary
WE ARE REMODELING A BATHROOM, WE ARE UTILIZING AN EXISTING CIRCUIT THAT WAS FOR A JETTED TUB AND WE ARE GOING TO USE IT FOR A BATH FLOOR HEAT CIRCUIT. WE ARE CHANGING SOME EXISTING LIGHTING. · Electrical
Source for Signal summary (opens in new tab)
Address
Not found
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

16 signals
  • Oct 14, 2026
    Permit
    WE ARE REMODELING A BATHROOM, WE ARE UTILIZING AN EXISTING CIRCUIT THAT WAS FOR A JETTED TUB AND WE ARE GOING TO USE IT FOR A BATH FLOOR HEAT CIRCUIT. WE ARE CHANGING SOME EXISTING LIGHTING. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Oct 5, 2026
    Permit
    We are re-wiring the home on 3 levels and the garage. We are setting a 320Amp overhead service , 2 - 200amp panels in the basement and a 125amp sub-panel in the garage. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Aug 7, 2026
    Permit
    WE ARE REWIRING THE ENTIRE HOME ACCORDING TO DRAWINGS- ALL SUPPLIED BY A 320AMP OVERHEAD SERVICE WITH 2-200AMP PANELS · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jul 30, 2026
    Permit
    WE ARE GOING TO SET A 200AMP TEMPORARY POWER POLE IN THE BACK YARD FOR THE CONSTRUCTION PHASE AND THROUGH SIDING. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jul 13, 2026
    Permit
    We are remodeling the Kitchen in a condo and adding a bidet outlet. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jun 23, 2026
    Permit
    WE ARE ELIMINATING KNOB AND TUBE CIRCUITS ON THE SECOND FLOOR , AND WE ARE SWAPPING OUT THE EXISTING PANEL TO HAVE SPACE FOR FUTURE EXPANSION. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • May 26, 2026
    Permit
    Changing the electrical panel to allow more breaker space for future expansion · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • May 6, 2026
    Permit
    We are setting a temporary power pole on a project that has an existing overhead 200AMP Service, for the construction phase, as they are lifting the house. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • May 6, 2026
    Permit
    WE ARE ADDING A COUPLE LIGHTS AND EXTENDING AN EXISTING CIRCUIT · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Apr 22, 2026
    Permit
    WE ARE ADDING 1 LEVEL 2 EV CHARGER IN GARAGE · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Mar 6, 2026
    Permit
    we are adding a 150Amp Sub-Panel and remodeling in the Kitchen · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Feb 11, 2026
    Permit
    we are wiring a remodel, adding a 125 amp sub-panel, adding a heat pump, moving an existing 60amp EV Charger · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jan 17, 2026
    Permit
    we are running from a previously set EV disconnect to the charger. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jan 13, 2026
    Permit
    Basement ADU · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Dec 4, 2025
    Permit
    We are wiring an outdoor kitchen with future heat and a couple dedicated circuits [8/13/2026 PGF Added 125A feeder to permit per contractor request. Post-issuance change fee included.] · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Nov 13, 2025
    Permit
    WE ARE REWIRING HOME AND REBUILDING AN EXISTING 200 AMP SERVICE · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)