Seer/Prospects/Innovative Systems Tech, Inc
Back to prospects

Innovative Systems Tech, Inc

SEATTLE, WA · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 4 / 20Tier C
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness3 / 5Latest signal is within 180 days.
Place0 / 5WA is outside the seller’s region and target regions.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
Innovative Systems Tech, Inc
Source for Company (opens in new tab)
Signal source
Seattle electrical permits
Signal date
Aug 10, 2026
Source for Signal date (opens in new tab)
Signal count
24 saved signals, 0 in the last 90 days
Signal summary
Furnish and install (4) new 120V duplex receptacle outlets in the parking garage for signage and banner power. Utilize an existing non-dedicated branch circuit located within approximately 25 feet of the first outlet location. Furnish and install surface-mounted EMT conduit between power source and new outlet locations. Furnish and install conductors, outlet boxes, receptacles, covers, fittings, connectors, and associated mounting hardware. Make all electrical connections to the existing po · Electrical
Source for Signal summary (opens in new tab)
Address
Not found
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

24 signals
  • Aug 10, 2026
    Permit
    Furnish and install (4) new 120V duplex receptacle outlets in the parking garage for signage and banner power. Utilize an existing non-dedicated branch circuit located within approximately 25 feet of the first outlet location. Furnish and install surface-mounted EMT conduit between power source and new outlet locations. Furnish and install conductors, outlet boxes, receptacles, covers, fittings, connectors, and associated mounting hardware. Make all electrical connections to the existing po · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jul 22, 2026
    Permit
    REPLACE 4 EV CHARGERS · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jul 13, 2026
    Permit
    PACKAGE LOCKER ROOM ALTERATIONS Install one (1) 120V receptacle outside the parcel room below the LuxerOne equipment. Install three (3) Cat6 receptacle for camera power. Pull (1) Cat6 data cables from the IDF room located on the floor above to the parcel room. Furnish and install (1) electric door strike · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jun 5, 2026
    Permit
    Installing one (1) new dedicated electrical circuit from the electrical room to the package locker location · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jun 2, 2026
    Permit
    1. Wall Sconce Installation (2 Fixtures) Furnish and install (2) 120V hardwired outdoor wall sconces (customer-approved style similar to existing battery units) Install approximately 40 ft of exposed conduit from nearest power source Pull conductors, make all terminations, and weatherproof connections Mount fixtures securely to exterior surfaces 2. Photocell Control Provide and install (1) photocell to automatically control the new wall sconces Integrate photocell into circuit for dusk-t · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jun 1, 2026
    Permit
    Provide and install one (1) electric heater in the gym area, matching the existing unit previously installed. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • May 20, 2026
    Permit
    installing new appliance outlets in the East Courtyard and providing power for BBQ and fire bowl equipment on the East & West Terraces. Work includes conduit routing, branch circuit installation, power distribution, and all required coordination. East Courtyard - Dedicated Appliance Outlets (3) Provide and install three (3) 120V, 20A GFCI-protected appliance receptacles for sports equipment. East & West Terraces - BBQ & Fire Bowl Power -East Terrace Extend an existing circuit for two (2) GFCI-p · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Apr 23, 2026
    Permit
    connecting floor control valves and waterflow switches being installed by others, to Existing FACP. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Apr 23, 2026
    Permit
    connecting floor control valves and waterflow switches being installed by others, to Existing FACP. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Apr 23, 2026
    Permit
    connecting floor control valves and waterflow switches being installed by others, to Existing FACP. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Apr 16, 2026
    Permit
    Replace the breaker for the pool heater. Install the breaker and new 4/0-4/0 copper wire at the same time · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Mar 30, 2026
    Permit
    FIRE ALARM SYSTEM REPLACEMENT · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Mar 19, 2026
    Permit
    Dedicated Circuit Installation - Leasing Office Printer Install a new dedicated 120V circuit from the electrical panel located on the P-1 level to the printer location on the 1st floor. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Mar 10, 2026
    Permit
    Scope of Work - Included 1. Removal of Existing Fixture Safely disconnect and remove the existing track light and its associated mounting hardware. Cap or remove unused wiring as required. 2. New LED Canless Fixture Installation (Four 6" Trims) Layout and mark locations for four (4) new recessed LED canless downlights to evenly distribute illumination. Drill/cut new 6" ceiling openings using proper dust control. Install new IC-rated, canless LED trims with junction boxes. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Mar 3, 2026
    Permit
    Install a new 500-watt, 2-ft baseboard heater (120V)The heater will be connected to an existing 120V circuit currently powering a 900-watt heater in the elevator lobby. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Feb 10, 2026
    Permit
    Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Feb 9, 2026
    Permit
    Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jan 30, 2026
    Permit
    Utilize existing circuit to add one new light fixture and one new receptacle in the East Storage room. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jan 12, 2026
    Permit
    INSTALLATION OF 1 MINI HORN IN THE BASEMENT REPAIR DAMAGED WIRE FOR 3RD FLOOR PULL STATION · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jan 8, 2026
    Permit
    Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)