Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/HARBOUR POINT ELECTRIC INC
Back to prospects

HARBOUR POINT ELECTRIC INC

SEATTLE, WA · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 6 / 20Tier C
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness5 / 5Latest signal is within 30 days.
Place0 / 5WA is outside the seller’s region and target regions.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
HARBOUR POINT ELECTRIC INC
Source for Company (opens in new tab)
Signal source
Seattle electrical permits
Signal date
Oct 14, 2026
Source for Signal date (opens in new tab)
Signal count
18 saved signals, 5 in the last 90 days
Signal summary
fireplace power - added outlet for gas insert fireplace · Electrical
Source for Signal summary (opens in new tab)
Address
Not found
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

18 signals
  • Oct 14, 2026
    Permit
    fireplace power - added outlet for gas insert fireplace · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Oct 9, 2026
    Permit
    Temporary Job site power to accommodate residing work · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Oct 7, 2026
    Permit
    Basement level remodel · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Sep 11, 2026
    Permit
    Power for built in fireplace, tv outlet · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Aug 26, 2026
    Permit
    Bathroom remodel, replace knob and tube wiring in directly adjacent rooms. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Aug 6, 2026
    Permit
    EV circuit, Sub-panel · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Aug 6, 2026
    Permit
    Circuit and control wire for new mini-split system · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jul 31, 2026
    Permit
    bathroom and laundry in basement · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jul 31, 2026
    Permit
    Kitchen Remodel, with Panel change - disconnect added inline on the exterior ahead of panel. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jul 23, 2026
    Permit
    adding whip (120v) to build in gas fireplace · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jul 8, 2026
    Permit
    patio wiring, added circuits for outdoor living / kitchenette · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jun 25, 2026
    Permit
    Fireplace power for gas insert fireplace · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Apr 22, 2026
    Permit
    Added top floor bathroom, main floor kitchen, hallway lighting alterations, basement bed, bath, laundry, bonus · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Apr 16, 2026
    Permit
    basement lighting alterations · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Apr 3, 2026
    Permit
    Repair to water damaged 200 amp panel and meter, increase in breaker space of panel for future considerations. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Mar 5, 2026
    Permit
    Wiring for insert fireplace · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jan 8, 2026
    Permit
    Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Nov 13, 2025
    Permit
    Fireplace power · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)