Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/Integrity Energy Systems
Back to prospects

Integrity Energy Systems

SEATTLE, WA · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 5 / 20Tier C
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness4 / 5Latest signal is within 90 days.
Place0 / 5WA is outside the seller’s region and target regions.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
Integrity Energy Systems
Source for Company (opens in new tab)
Signal source
Seattle electrical permits
Signal date
Oct 2, 2026
Source for Signal date (opens in new tab)
Signal count
17 saved signals, 2 in the last 90 days
Signal summary
replaced a 80% AFUE furnace with a 96% AFUE Furnace - replaced thermostat only - connected to all existing connections [C.Kenefick 10/15/2026 - Closed at request of permit holder, Integrity Energy. A new permit will be required for completion of work. Full refund OK this permit.] · Electrical
Source for Signal summary (opens in new tab)
Address
Not found
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

17 signals
  • Oct 2, 2026
    Permit
    replaced a 80% AFUE furnace with a 96% AFUE Furnace - replaced thermostat only - connected to all existing connections [C.Kenefick 10/15/2026 - Closed at request of permit holder, Integrity Energy. A new permit will be required for completion of work. Full refund OK this permit.] · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Aug 20, 2026
    Permit
    Add savant whole home battery system [8/20/26 BGO - Approved ESS Plan Set] · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jun 24, 2026
    Permit
    24v el from panel to ODU 240v circuit from panel to ODU 120v GFCI outlet · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jun 16, 2026
    Permit
    unit 1109 Install 240v from panel to ODU Install 240 form ODU to cassettes · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jun 3, 2026
    Permit
    mast repair at meter and new properly sized conduit 240v circuit to air handler new GFCI outlet at air handler sub panel with circuit to Heat Pump extend 70 amp circuit to new Heat Pump · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • May 13, 2026
    Permit
    panel replacement of 200 amp Siemens 40-60 space panel and installing 30 am circuit · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Apr 28, 2026
    Permit
    adding 240v el from air handler to ODU and 240v circuit to ODU · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Mar 19, 2026
    Permit
    add 240v el from air handler to cassettes and 240v circuit from el to ODU · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Mar 11, 2026
    Permit
    add 240v heat pump circuit and level 2 EV car charger · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Mar 5, 2026
    Permit
    rewiring home with new 200 amp panel and adding switches, lights and outlets · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Feb 25, 2026
    Permit
    adding 2 heat pump water heaters, 100a subpanel, 1 level2 ev charger with 50a , and 240v el from panel to ODU · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Dec 18, 2025
    Permit
    240 el for hp and air handler · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Dec 17, 2025
    Permit
    240 el circuit form panel to odu · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Dec 17, 2025
    Permit
    new 240v el from air handler to ODU and 240 circuit from panel to odu · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Nov 26, 2025
    Permit
    install 50 amp circuit · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Nov 18, 2025
    Permit
    120v el · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Nov 12, 2025
    Permit
    200a panel change, service upgrade and heat pump install · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)