Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/KOLKAY ELECTRIC INC
Back to prospects

KOLKAY ELECTRIC INC

SEATTLE, WA · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 6 / 20Tier C
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness5 / 5Latest signal is within 30 days.
Place0 / 5WA is outside the seller’s region and target regions.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
KOLKAY ELECTRIC INC
Source for Company (opens in new tab)
Signal source
Seattle electrical permits
Signal date
Oct 26, 2026
Source for Signal date (opens in new tab)
Signal count
6 saved signals, 1 in the last 90 days
Signal summary
FULL MODERNIZATION OF NINE (9) ELECTRIC TRACTION PASSENGER ELEVATORS INCLUDING ONE (1) 23-STOP GEARLESS OVERHEAD TRACTION ELEVATOR AND FIVE (5) 20-STOP GEARLESS OVERHEAD TRACTION ELEVATORS SERVING A HIGH-RISE TOWER, AS WELL AS FULL MODERNIZATION AND CONVERSION FROM GEARED TO GEARLESS MACHINES FOR THREE (3) EXISTING 5-STOP GEARED OVERHEAD TRACTION ELEVATORS SERVING THE OTHER BUILDINGS IN THE UW TOWER COMPLEX. THE PROJECT ALSO INCLUDES ASSOCIATED ELECTRICAL AND MECHANICAL IMPROVEMENTS TO BRI · Electrical
Source for Signal summary (opens in new tab)
Address
Not found
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

6 signals
  • Oct 26, 2026
    Permit
    FULL MODERNIZATION OF NINE (9) ELECTRIC TRACTION PASSENGER ELEVATORS INCLUDING ONE (1) 23-STOP GEARLESS OVERHEAD TRACTION ELEVATOR AND FIVE (5) 20-STOP GEARLESS OVERHEAD TRACTION ELEVATORS SERVING A HIGH-RISE TOWER, AS WELL AS FULL MODERNIZATION AND CONVERSION FROM GEARED TO GEARLESS MACHINES FOR THREE (3) EXISTING 5-STOP GEARED OVERHEAD TRACTION ELEVATORS SERVING THE OTHER BUILDINGS IN THE UW TOWER COMPLEX. THE PROJECT ALSO INCLUDES ASSOCIATED ELECTRICAL AND MECHANICAL IMPROVEMENTS TO BRI · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Apr 2, 2026
    Permit
    Installing conduit pathways, transformer, and panelboard · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jan 27, 2026
    Permit
    Installing conduit pathways and providing a new breaker. [C.Kenefick 3/5/2026 - four 20a circuits being installed. Fees corrected.] · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jan 13, 2026
    Permit
    Upgrading existing fire alarm panel to voice. Upgrading existing horn strobe devices to speaker strobes. This is a joint venture with Kolkay and Siemens Industry · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Nov 25, 2025
    Permit
    This project is nearly completely built. We had planned on utilizing an electrical over the counter permit, but learned that this should have gone through plan review. This is a City of Seattle FAS facility. The project provides (8) L2 chargers, a transformer and a panelboard, and associated distribution. [11/25/25 KEF - Plan set approved. This permit supersedes OTC permit 7101197-EL. Feeder inspection required.] · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Nov 12, 2025
    Permit
    This project is an expansion of level 2 chargers and main electrical equipment (two transformers, panel boards and distribution) in support of powering these chargers. [11/12/25 KEF - Plan set approved.] 10/13/26 SK renewal · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)