Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/R-C TRUE LINE CORPORATION
Back to prospects

R-C TRUE LINE CORPORATION

SEATTLE, WA · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 6 / 20Tier C
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness5 / 5Latest signal is within 30 days.
Place0 / 5WA is outside the seller’s region and target regions.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
R-C TRUE LINE CORPORATION
Source for Company (opens in new tab)
Signal source
Seattle electrical permits
Signal date
Nov 10, 2026
Source for Signal date (opens in new tab)
Signal count
22 saved signals, 3 in the last 90 days
Signal summary
Furnish and install added lighting and controls, relocate existing panels, outlets and kitchen equipment. · Electrical
Source for Signal summary (opens in new tab)
Address
Not found
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

22 signals
  • Nov 10, 2026
    Permit
    Furnish and install added lighting and controls, relocate existing panels, outlets and kitchen equipment. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Oct 13, 2026
    Permit
    Installation of low voltage cabling to 25 devices. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Aug 28, 2026
    Permit
    Install two new sub panels. Install circuits and junction boxes for install of track lighting by others, Show lighting by others, and data by others. Install general use outlets as shown along with install of lighting in the restroom remodel area, and party room. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Aug 12, 2026
    Permit
    Install new panel and outlets in kitchen. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Aug 12, 2026
    Permit
    Relocate one panel and transformer, install additional panel and transformer. Outlets and connections to kitchen. No changes to lighting or mechanical. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jul 14, 2026
    Permit
    Relocate 200amp piece of equipment · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jul 1, 2026
    Permit
    Lighting and kitchen remodel. Service to remain. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jun 17, 2026
    Permit
    Electrical scope includes demolition of existing systems; installation of new lighting, power distribution, receptacles, and controls; and provision of dedicated circuits and connections for kilns, clay equipment, and associated mechanical systems, integrated with the existing building electrical infrastructure per plan. [3/26/26 BGO - Approved Plan Set for Art School] · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jun 9, 2026
    Permit
    Install 2 outlets and 4 lights · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jun 3, 2026
    Permit
    TI of 2nd floor to art studio space with gallery and independent studio spaces. Existing service and shared kitchen. Power to 6 fan coil units and low voltage by others. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • May 29, 2026
    Permit
    Installation of a cooler, 1-20amp connection, 1-30amp connections, and 4 outlets in small remodel to existing space. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • May 27, 2026
    Permit
    install lighting and code compliant controls, remove existing trans and install 45kva replacement, install 200amp 480v panel, install 225amp 120v panel, outlets to kitchen equipment, data to pos and printer unit, and all other low voltage by others. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • May 21, 2026
    Permit
    Install 2 - 200amp panels, relocated 1 - 200amp panel, Install lighting and controls, outdoor heaters in open air dinning area, kitchen equipment, connections to HVAC, and general receptacles. [5/21/26 KEF - Plan set approved.] · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Mar 10, 2026
    Permit
    Install hood and Oven · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Feb 27, 2026
    Permit
    Swap lights over bar and corner booth, disconnect host stand and install quad outlet in new host stand using existing power, LED lighting at back bar, power to 3 - 30amp outdoor units. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Feb 27, 2026
    Permit
    Install lighting and electric heaters, 20 general use receptacles, power to water heater, hand dryers, sign circuit. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Feb 26, 2026
    Permit
    Install lighting and code compliant controls, Remove existing trans and install 45kva replacement, Install 200amp 480v panel, install 225amp 120v panel, Outlets to kitchen equipment, data to POS and Printer units, and all other low voltage by others. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Feb 2, 2026
    Permit
    Various data locations throughout the location along with security cameras. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jan 5, 2026
    Permit
    Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Dec 8, 2025
    Permit
    Electrical work to support restaurant TI per plan[4/18/25 BGO - Confirm Valuation after EC assignment] [6/26/25 BGO - Approved Revised Plan Set] · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)