Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/Region 6 Security
Back to prospects

Region 6 Security

SEATTLE, WA · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 6 / 20Tier C
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness5 / 5Latest signal is within 30 days.
Place0 / 5WA is outside the seller’s region and target regions.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
Region 6 Security
Source for Company (opens in new tab)
Signal source
Seattle electrical permits
Signal date
Oct 29, 2026
Source for Signal date (opens in new tab)
Signal count
17 saved signals, 3 in the last 90 days
Signal summary
Installing (1) new IP camera in field and new network rack and server equipment in headend. We will be pulling our own cable. · Electrical
Source for Signal summary (opens in new tab)
Address
Not found
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

17 signals
  • Oct 29, 2026
    Permit
    Installing (1) new IP camera in field and new network rack and server equipment in headend. We will be pulling our own cable. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Oct 22, 2026
    Permit
    Installing (5) new horn strobes and (4) new strobes as part of tenants TI space. These devices will be installed on the existing NAC that is in this space. One (1) existing horn strobe will be relocated and reused on the 2nd floor. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Oct 1, 2026
    Permit
    Low Voltage Scope 1. Replacing existing access control system with (3) control units and (35) total field devices. Reusing existing cable for (14) field devices. Running new cable for (21) field devices. 2. Replacing existing CCTV system with (1) control unit and (14) field devices. Will be running new cable. High Voltage Scope 1. Extending existing branch circuits to hardwire (7) lock power supplies. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jul 21, 2026
    Permit
    We are installing a new CCTV video system consisting of (1) controller and (30) field devices. Cabling will be pulled by others. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jul 20, 2026
    Permit
    1. Installing new Access Control System consisting of (1) control unit and (1) field device. We will be pulling our own wire. 2. Pull two cat6 from headend to entrance for future use. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jun 25, 2026
    Permit
    Adding (1) card access reader to First Floor Entrance of to existing access control system. We are pull new access control cable from existing control panel to reader location. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jun 8, 2026
    Permit
    Pulling cat6 to (5) garage locations for network access points. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jun 5, 2026
    Permit
    1. Wireless network, installing (11) wireless access points going back to 1 router/control unit. Cable to be pulled by others. 2. Video. Installing (38) IP cameras going back to (2) control units in (2) headends. Cable to be pulled by others. 3. AV. Installing (25) speakers in three locations, going back to (3) control units in (3) headends. We will be pulling speaker cable. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • May 5, 2026
    Permit
    1. Installing (3) new cameras to existing CCTV system. Running new cable to existing headend switches. 2. Installing (2) new card readers to existing access control system. Running new cable from field devices to existing control unit 3. Installing new main entrance intercom. Running new cable from main entrance to control unit at reception desk. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • May 5, 2026
    Permit
    1. Pulling new cat6 cable from existing headend switches to (10) new AP locations. 2. Installing (7) new card readers to existing access control system. Pulling new cable from field devices to (3) control units. 3. Installing (14) new IP cameras to existing CCTV system. Pulling new cable from field devices to existing headend switches. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Apr 8, 2026
    Permit
    Access Control: Installing (6) field devices going back to 2 headend control unit. Cable to be pulled by others. Video: Installing (15) IP cameras going back to 2 IDF room switches. Cable to be pulled by others. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Apr 2, 2026
    Permit
    We are installing new access control system consisting of (3) control units and (6) field devices. We will be reusing existing LV wiring. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Apr 2, 2026
    Permit
    Installing (2) access control field devices to an existing system. We will be puttling new wire to these locations. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Mar 20, 2026
    Permit
    Adding on to existing ACS. 1. Installing (4) fielding devices going back to (1) control unit 2. Installing (6) readers into elevator cabs going back to (2) control units. We will be pulling new cable to these locations. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Feb 12, 2026
    Permit
    We are replacing existing access control system. We are pulling Cat6 to (52) field locations, and LV cable to (12) field devices. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Nov 26, 2025
    Permit
    Replacing existing access control system. Installing (5) field devices going back to (2) control units. We are pull new wire. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Nov 10, 2025
    Permit
    Replacing residential electrical panel. not changing service. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)