Installing (5) new horn strobes and (4) new strobes as part of tenants TI space. These devices will be installed on the existing NAC that is in this space. One (1) existing horn strobe will be relocated and reused on the 2nd floor. · Electrical
No product keyword matched · Seattle electrical permits
Low Voltage Scope
1. Replacing existing access control system with (3) control units and (35) total field devices. Reusing existing cable for (14) field devices. Running new cable for (21) field devices.
2. Replacing existing CCTV system with (1) control unit and (14) field devices. Will be running new cable.
High Voltage Scope
1. Extending existing branch circuits to hardwire (7) lock power supplies. · Electrical
No product keyword matched · Seattle electrical permits
1. Installing new Access Control System consisting of (1) control unit and (1) field device. We will be pulling our own wire.
2. Pull two cat6 from headend to entrance for future use. · Electrical
No product keyword matched · Seattle electrical permits
Adding (1) card access reader to First Floor Entrance of to existing access control system. We are pull new access control cable from existing control panel to reader location. · Electrical
No product keyword matched · Seattle electrical permits
1. Wireless network, installing (11) wireless access points going back to 1 router/control unit. Cable to be pulled by others.
2. Video. Installing (38) IP cameras going back to (2) control units in (2) headends. Cable to be pulled by others.
3. AV. Installing (25) speakers in three locations, going back to (3) control units in (3) headends. We will be pulling speaker cable. · Electrical
No product keyword matched · Seattle electrical permits
1. Installing (3) new cameras to existing CCTV system. Running new cable to existing headend switches.
2. Installing (2) new card readers to existing access control system. Running new cable from field devices to existing control unit
3. Installing new main entrance intercom. Running new cable from main entrance to control unit at reception desk. · Electrical
No product keyword matched · Seattle electrical permits
1. Pulling new cat6 cable from existing headend switches to (10) new AP locations.
2. Installing (7) new card readers to existing access control system. Pulling new cable from field devices to (3) control units.
3. Installing (14) new IP cameras to existing CCTV system. Pulling new cable from field devices to existing headend switches. · Electrical
No product keyword matched · Seattle electrical permits
Access Control:
Installing (6) field devices going back to 2 headend control unit. Cable to be pulled by others.
Video:
Installing (15) IP cameras going back to 2 IDF room switches. Cable to be pulled by others. · Electrical
No product keyword matched · Seattle electrical permits
Adding on to existing ACS.
1. Installing (4) fielding devices going back to (1) control unit
2. Installing (6) readers into elevator cabs going back to (2) control units.
We will be pulling new cable to these locations. · Electrical