Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/Lalos Plumbing
Back to prospects

Lalos Plumbing

AUSTIN, TX · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 6 / 20Tier C
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness5 / 5Latest signal is within 30 days.
Place0 / 5TX is outside the seller’s region and target regions.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
Lalos Plumbing
Source for Company (opens in new tab)
Signal source
Austin issued construction permits
Signal date
Nov 1, 2026
Source for Signal date (opens in new tab)
Signal count
2 saved signals, 2 in the last 90 days
Signal summary
Plumbing Permit · Bldg 3 Unit 370- NEW ABOVE-GROUND LP (PROPANE) GAS PIPING INSTALLATION COMMERCIAL ROASTING EQUIPMENT. This is a standalone new-work trade permit (gas piping) NOT a repair permit. No existing gas piping is being repaired replaced or altered; this is new piping to a newly installed appliance. PURPOSE: Install new above-ground LP gas piping to supply a commercial coffee roaster (IMF RM-15A_STD manufacturer data sheet Doc ST_00) inside the modular building at this address. Piping runs from the roasters gas train inlet connection to a new exterior termination stub at the rear exterior wall of the modular building. The exterior stub is a dead-end termination point only valved and capped for future connection by the propane supplier. Contractor scope ends at the exterior stub; it does NOT include the propane tank exterior regulators or any underground/trenched piping from the tank to the stub; that work is performed separately by the propane supply company. WORK DIMENSIONS: Total piping run approximately 25 to 35 feet (35 ft design basis) routed above ground through the rear interior of the modular building to an exterior wall penetration terminating at an exterior stub at the rear of the building. Pipe size: 3/4 in nominal Schedule 40 black steel trunk line reduced to 1/2 in NPT at the roasters gas train connection. Scope includes: pipe sizing and installation appliance shutoff valve at the roaster union sediment trap (drip leg) wall penetration with sleeve and seal exterior stub termination (valved and capped) pressure test and leak test of all new piping and coordination of required city inspections. No underground piping by the applicant. APPLIANCE DIMENSIONS AND SPECS (IMF RM-15A_STD data sheet): Overall dimensions 87.16 in L x 41.73 in W x 76.45 in H; weight 1433 lb (650 kg); burner Riello Gulliver BS1F LPG; maximum thermal input 178000 BTU/hr; LPG consumption 8.4 lb/hr; required inlet pressure minimum 12 in WC maximum 48 in WC; gas train connection 1/2 in; c
Source for Signal summary (opens in new tab)
Address
5104 Moss, LAGO VISTA, 78645-____
Source for Address (opens in new tab)
Phone
5129622518
Source for Phone (opens in new tab)
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

2 signals
  • Nov 1, 2026
    Permit
    Plumbing Permit · Bldg 3 Unit 370- NEW ABOVE-GROUND LP (PROPANE) GAS PIPING INSTALLATION COMMERCIAL ROASTING EQUIPMENT. This is a standalone new-work trade permit (gas piping) NOT a repair permit. No existing gas piping is being repaired replaced or altered; this is new piping to a newly installed appliance. PURPOSE: Install new above-ground LP gas piping to supply a commercial coffee roaster (IMF RM-15A_STD manufacturer data sheet Doc ST_00) inside the modular building at this address. Piping runs from the roasters gas train inlet connection to a new exterior termination stub at the rear exterior wall of the modular building. The exterior stub is a dead-end termination point only valved and capped for future connection by the propane supplier. Contractor scope ends at the exterior stub; it does NOT include the propane tank exterior regulators or any underground/trenched piping from the tank to the stub; that work is performed separately by the propane supply company. WORK DIMENSIONS: Total piping run approximately 25 to 35 feet (35 ft design basis) routed above ground through the rear interior of the modular building to an exterior wall penetration terminating at an exterior stub at the rear of the building. Pipe size: 3/4 in nominal Schedule 40 black steel trunk line reduced to 1/2 in NPT at the roasters gas train connection. Scope includes: pipe sizing and installation appliance shutoff valve at the roaster union sediment trap (drip leg) wall penetration with sleeve and seal exterior stub termination (valved and capped) pressure test and leak test of all new piping and coordination of required city inspections. No underground piping by the applicant. APPLIANCE DIMENSIONS AND SPECS (IMF RM-15A_STD data sheet): Overall dimensions 87.16 in L x 41.73 in W x 76.45 in H; weight 1433 lb (650 kg); burner Riello Gulliver BS1F LPG; maximum thermal input 178000 BTU/hr; LPG consumption 8.4 lb/hr; required inlet pressure minimum 12 in WC maximum 48 in WC; gas train connection 1/2 in; c
    No product keyword matched · Austin issued construction permits
    Source record (opens in new tab)
  • Oct 1, 2026
    Permit
    Plumbing Permit · ePlan: Commercial Expedited Review - Interior Remodel to Existing Energy X Office Building (2575 SF)
    No product keyword matched · Austin issued construction permits
    Source record (opens in new tab)