Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/V. DISALVO CONTRACTING CO
Back to prospects

V. DISALVO CONTRACTING CO

MANHATTAN, Manhattan, NY · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 8 / 20Tier B
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness2 / 5Latest signal is within 270 days.
Place5 / 5NY matches the seller’s region.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
V. DISALVO CONTRACTING CO
Source for Company (opens in new tab)
Signal source
NYC DOB building permits
Signal date
May 4, 2026
Source for Signal date (opens in new tab)
Signal count
25 saved signals, 0 in the last 90 days
Signal summary
General Construction · MINOR WORK TO COMBINE UNITS #B & C ON THE 5TH FLOOR PER TPPN#3/97. REMOVAL OF A MINOR PORTION OF THE NON-LOAD BEARING PARTITION BETWEEN THE UNITS AS PER DRAWINGS FILED HEREIN. NO CHANGE TO EGRESS, USE OR OCCUPANCY UNDER THIS APPLICATION
Source for Signal summary (opens in new tab)
Address
4214 THIRD AVENUE
Source for Address (opens in new tab)
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

25 signals
  • May 4, 2026
    Permit
    General Construction · MINOR WORK TO COMBINE UNITS #B & C ON THE 5TH FLOOR PER TPPN#3/97. REMOVAL OF A MINOR PORTION OF THE NON-LOAD BEARING PARTITION BETWEEN THE UNITS AS PER DRAWINGS FILED HEREIN. NO CHANGE TO EGRESS, USE OR OCCUPANCY UNDER THIS APPLICATION
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Apr 22, 2026
    Permit
    General Construction · Interior renovation of apartment. No change to use, occupancy, or egress.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Apr 17, 2026
    Permit
    Mechanical Systems · MECHANICAL WORK AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Apr 14, 2026
    Permit
    Structural · Structural work filed to install new steel lintels, masonry infill and slab repair.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Mar 4, 2026
    Permit
    Mechanical Systems · Mechanical to be preformed in existing unit #3F/3G on 3rd fl. Initial general construction & subsequent plumbing application to be filed. All in accordance with submit plans. All in accordance with submitted plans. No changes to use, egress or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Mar 4, 2026
    Permit
    General Construction · Exterior and combination as per TPPN 3/1997 proposed in unit #3F/3G on 3rd fl. Initial general construction, subsequent plumbing and mechanical application to be filed. All in accordance with submitted plans. No changes to use, egress or occupancy
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Feb 6, 2026
    Permit
    General Construction · Filing for interior demolition of non-load bearing partitions and general construction of an apartment unit. No change of use, egress or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Feb 6, 2026
    Permit
    Mechanical Systems · Filing for mechanical renovations (PTAC, FCU and Air Cooled Heat Pump units) as per plans filed. No change of use, egress or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jan 27, 2026
    Permit
    Mechanical Systems · MECHANICAL WORK ASSOCIATED WITH THE RENOVATION OF AN EXISTING bathroom and bedroom. NO CHANGE TO USE, EGRESS OF OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jan 20, 2026
    Permit
    General Construction · Installation of a convenience door between dwelling units 71 & 72 as per plans filed herewith. No change to use egress or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jan 5, 2026
    Permit
    Mechanical Systems · AC SPLIT SYSTEM UNITS, RADIATORS, WALL GRILLES AND BATHROOM WARM ELECTRIC FLOOR INSTALLATION FOR APT. 8 AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jan 5, 2026
    Permit
    Mechanical Systems · Modifications to ductwork and grilles. Fan coil units existing to remain. No change in use, egress or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jan 5, 2026
    Permit
    Mechanical Systems · Modification to the existing mechanical system in conjunction with the Interior renovation and apartment combination as per plans filed herewith. No change to use, egress or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jan 5, 2026
    Permit
    General Construction · INTERIOR RENOVATION OF AN EXISTING APARTMENT, INCLUDING PARTITION CHANGES. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jan 5, 2026
    Permit
    Mechanical Systems · Mechanical work file in conjunction with apartment # 13B renovation.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jan 5, 2026
    Permit
    General Construction · Renovation of an existing apartment#13B on the 13th Floor. Work include non-structural demolition, general construction and replacement of window in the existing openings
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jan 5, 2026
    Permit
    General Construction · Interior renovation and combination as per TPPN 3/1997 proposed in unit #3F/3G on 3rd fl. Subsequent plumbing, general construction/exterior & mechanical application to be filed. All in accordance w/ submitted plans. No changes to use, egress or occupancy
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jan 5, 2026
    Permit
    General Construction · Interior renovation and apartment combo per TPPN 3/97 including removal and installation of non-bearing partitions and related finishes; new thru wall openings on secondary facade as per plans filed herewith. No change to use, egress or occupancy
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jan 5, 2026
    Permit
    General Construction · HEREWITH FILING PARTIAL DEMO/SEQUENCE WORK AS PER PLANS. THIS WORK IS ASSOCIATED TO ALT -II FILINGS M00826205, M00826236, M00827043, M00826248.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jan 5, 2026
    Permit
    Mechanical Systems · NEW SPLIT SYSTEM AIR CONDITIONING AND EXHAUST FANINSTALLATION FOR APARTMENT RENOVATION INCONJUNCTION WITH GC #M01177943-I1. NO CHANGE INUSE, EGRESS, OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)