Plumbing · For installation of gas piping and riser on building exterior (floors 001-016) with new gas vents as per plans submitted herewith. No change in use egress or occupancy.
Plumbing · For installation of gas piping and riser on building exterior (floors 001-016) with new gas vents as per plans submitted herewith. No change in use egress or occupancy.
No product keyword matched · NYC DOB building permits
General Construction · INTERIOR AND STOREFRONT MODIFICATIONS FOR CHANGE OF USE OF FLOOR-1 RETAIL (COM) SPACE TO ASSEMBLY/RESTAURANT (F-4 + D2). MODIFICATION TO INTERIOR STAIR AT TENANT SPACE. INTERIOR PARTITIONS AND FINISHES ON CELLAR WITH NO CHANGE OF USE.
No product keyword matched · NYC DOB building permits
General Construction · ALT-CO FILED FOR CHANGE IN EGRESS, OCCUPANCY AND USE GROUP AT CELLAR & 1ST FL. INCLUDES INTERIOR DEMOLITION AND RENOVATION, NEW STOREFRONT
No product keyword matched · NYC DOB building permits
Boiler Equipment · REMOVE EXISTING CAST IRON BOILER AND EXISTING OIL FIRED BURNER. REMOVE OIL FUEL BURNER. INSTALL NEW CAST IRON WEIL-MCLAIN GAS FIRED STEAM BOILER SERIES 88,8 SECTIONS. CONNECT NEW BOILER BURNER SYSTEM TO EXISTING GAS SYSTEMAND EXISTING STEAM CONDENSATE
No product keyword matched · NYC DOB building permits
Plumbing · INSTALL NEW GAS BURNER. PROVIDE NEW 3 GAS LINE FROM METER TO BOILER ROOM. PROVIDE GAS METER. CONNECT NEW BURNER TO BOILER / HEATING SYSTEM. TO REGISTER 1 EXISTING BOILER AND 3 EXISTING HOT WATER HEATERS.
No product keyword matched · NYC DOB building permits
General Construction · APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 2ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
No product keyword matched · NYC DOB building permits
General Construction · gut renovate existing restrooms of an existing office space. mechanical, sprinkler and plumbing to be filed under separate application. no change in use, egress occupancy.
No product keyword matched · NYC DOB building permits
General Construction · Hereby filing to renovate greenhouse at the facilities roof level as shown on plans filed herewith. No change to use, occupancy or egress.
No product keyword matched · NYC DOB building permits
General Construction · INTERIOR AND STOREFRONT MODIFICATIONS FOR CHANGE OF USE OF FLOOR-1 RETAIL (COM) SPACE TO ASSEMBLY/RESTAURANT (F-4 + D2). MODIFICATION TO INTERIOR STAIR AT TENANT SPACE. INTERIOR PARTITIONS AND FINISHES ON CELLAR WITH NO CHANGE OF USE.
No product keyword matched · NYC DOB building permits