Building Permit · Installation of a 240 sf (8 ft x 30 ft) pre-fabricated aluminum covered walkway at the Eastside campus entrance to provide weather protection from the drop-off point to the building. Scope includes laying out and placing 6 concrete footings to support structural columns. All work to be completed per engineering specifications.
Building Permit · Installation of a 240 sf (8 ft x 30 ft) pre-fabricated aluminum covered walkway at the Eastside campus entrance to provide weather protection from the drop-off point to the building. Scope includes laying out and placing 6 concrete footings to support structural columns. All work to be completed per engineering specifications.
No product keyword matched · Austin issued construction permits