Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/Structura, Inc.
Back to prospects

Structura, Inc.

AUSTIN, TX · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 5 / 20Tier C
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness4 / 5Latest signal is within 90 days.
Place0 / 5TX is outside the seller’s region and target regions.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
Structura, Inc.
Source for Company (opens in new tab)
Signal source
Austin issued construction permits
Signal date
Aug 25, 2026
Source for Signal date (opens in new tab)
Signal count
13 saved signals, 1 in the last 90 days
Signal summary
Building Permit · INTERIOR REMODEL-RECEPTION AREA AND EXPANDING INTO 3500SF OFFICE SPACE THE REST OF THE SPACE IS PAINT AND FLOORING
Source for Signal summary (opens in new tab)
Address
9517 McNiel, AUSTIN, 78758
Source for Address (opens in new tab)
Phone
5124959702
Source for Phone (opens in new tab)
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

13 signals
  • Aug 25, 2026
    Permit
    Building Permit · INTERIOR REMODEL-RECEPTION AREA AND EXPANDING INTO 3500SF OFFICE SPACE THE REST OF THE SPACE IS PAINT AND FLOORING
    No product keyword matched · Austin issued construction permits
    Source record (opens in new tab)
  • Jun 8, 2026
    Permit
    Building Permit · Interior remodel with storage and break room. Change the front door to accommodate for new suite and create a small area of corridor-area to the right is open to below
    No product keyword matched · Austin issued construction permits
    Source record (opens in new tab)
  • May 18, 2026
    Permit
    Building Permit · INTERIOR REMODEL OF EXISTING OFFICE SPACE IN A SINGLE TENANT BUILDING.
    No product keyword matched · Austin issued construction permits
    Source record (opens in new tab)
  • May 8, 2026
    Permit
    Building Permit · ePlan: Commercial Expedited Review - New Construction of Two-Story Shell for Future Showroom and Offices for Architectural Stone Products. Scope of Work includes 1st floor Showroom office and Mezzanine. (23163 SF)
    No product keyword matched · Austin issued construction permits
    Source record (opens in new tab)
  • May 8, 2026
    Permit
    Building Permit · ePlan: Commercial Expedited Review - First Time Finish Out For 1st floor and Mezzanine - Showroom and Sales Office (23163 SF)
    No product keyword matched · Austin issued construction permits
    Source record (opens in new tab)
  • May 8, 2026
    Permit
    Building Permit · ePlan: Commercial Expedited Review - First Time Finish Out For 2nd floor. Future B or M Occupancy. (23163 SF)
    No product keyword matched · Austin issued construction permits
    Source record (opens in new tab)
  • Mar 31, 2026
    Permit
    Building Permit · Rework existing mechanical units on level 2. Add additional louver to the area to server 3 new intake fans. Work is in exterior room no Asbestos. Work is in non occupied mechanical room no TAS.
    No product keyword matched · Austin issued construction permits
    Source record (opens in new tab)
  • Mar 24, 2026
    Permit
    Building Permit · Spec suite on level 6. Renovating existing work sharing layout to become spec suite office space with conference room offices phone rooms and support spaces. NO ACCESS CONTROL IN SCOPE. Existing lighting to be relocated reused. Remainder of Units not in scope and were submitted with 2025-158119 PR
    No product keyword matched · Austin issued construction permits
    Source record (opens in new tab)
  • Mar 13, 2026
    Permit
    Building Permit · Spec suite on level 6. Existing Break Room with updated finishes only. Renovating existing worksharing layout to become spec suite office space with conference room offices phone rooms and support spaces.Access control plan provided as separate attachments. Existing lighting to be relocated/reused. (Suite 600 615 625 and 635) Spec suite corridor and existing stair infill on level 6 (within unit 635). Building core is existing to remain. Corridor finish refresh. Demo two doors. Access control plan not part of corridor and stair scope. No access control requested. Existing stair to be demolished and infilled. (FLR 6)
    No product keyword matched · Austin issued construction permits
    Source record (opens in new tab)
  • Mar 13, 2026
    Permit
    Building Permit · Spec suite on level 6. Existing Break Room with updated finishes only. Renovating existing worksharing layout to become spec suite office space with conference room offices phone rooms and support spaces.Access control plan provided as separate attachments. Existing lighting to be relocated/reused. (Suite 600 615 625 and 635) Spec suite corridor and existing stair infill on level 6 (within unit 635). Building core is existing to remain. Corridor finish refresh. Demo two doors. Access control plan not part of corridor and stair scope. No access control requested. Existing stair to be demolished and infilled. (FLR 6)
    No product keyword matched · Austin issued construction permits
    Source record (opens in new tab)
  • Mar 13, 2026
    Permit
    Building Permit · Spec suite on level 6. Existing Break Room with updated finishes only. Renovating existing worksharing layout to become spec suite office space with conference room offices phone rooms and support spaces.Access control plan provided as separate attachments. Existing lighting to be relocated/reused. (Suite 600 615 625 and 635) Spec suite corridor and existing stair infill on level 6 (within unit 635). Building core is existing to remain. Corridor finish refresh. Demo two doors. Access control plan not part of corridor and stair scope. No access control requested. Existing stair to be demolished and infilled. (FLR 6)
    No product keyword matched · Austin issued construction permits
    Source record (opens in new tab)
  • Mar 13, 2026
    Permit
    Building Permit · Spec suite on level 6. Existing Break Room with updated finishes only. Renovating existing worksharing layout to become spec suite office space with conference room offices phone rooms and support spaces.Access control plan provided as separate attachments. Existing lighting to be relocated/reused. (Suite 600 615 625 and 635) Spec suite corridor and existing stair infill on level 6 (within unit 635). Building core is existing to remain. Corridor finish refresh. Demo two doors. Access control plan not part of corridor and stair scope. No access control requested. Existing stair to be demolished and infilled. (FLR 6)
    No product keyword matched · Austin issued construction permits
    Source record (opens in new tab)
  • Mar 13, 2026
    Permit
    Building Permit · Spec suite on level 6. Existing Break Room with updated finishes only. Renovating existing worksharing layout to become spec suite office space with conference room offices phone rooms and support spaces.Access control plan provided as separate attachments. Existing lighting to be relocated/reused. (Suite 600 615 625 and 635) Spec suite corridor and existing stair infill on level 6 (within unit 635). Building core is existing to remain. Corridor finish refresh. Demo two doors. Access control plan not part of corridor and stair scope. No access control requested. Existing stair to be demolished and infilled. (FLR 6)
    No product keyword matched · Austin issued construction permits
    Source record (opens in new tab)