Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/Las Colinas Plumbing
Back to prospects

Las Colinas Plumbing

AUSTIN, TX · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 5 / 20Tier C
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness4 / 5Latest signal is within 90 days.
Place0 / 5TX is outside the seller’s region and target regions.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
Las Colinas Plumbing
Source for Company (opens in new tab)
Signal source
Austin issued construction permits
Signal date
Sep 22, 2026
Source for Signal date (opens in new tab)
Signal count
9 saved signals, 2 in the last 90 days
Signal summary
Plumbing Permit · Replace 1/2 rpz for the carbonator
Source for Signal summary (opens in new tab)
Address
1912 Univer, McKinney, 75071
Source for Address (opens in new tab)
Phone
2148564145
Source for Phone (opens in new tab)
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

9 signals
  • Sep 22, 2026
    Permit
    Plumbing Permit · Replace 1/2 rpz for the carbonator
    No product keyword matched · Austin issued construction permits
    Source record (opens in new tab)
  • Sep 17, 2026
    Permit
    Plumbing Permit · Sarku Japan Suite Spc VC - 03 Replace carbonator RPZ
    No product keyword matched · Austin issued construction permits
    Source record (opens in new tab)
  • Jul 27, 2026
    Permit
    Plumbing Permit · Replace non lead free RPZ on second floor for ice maker in server area
    No product keyword matched · Austin issued construction permits
    Source record (opens in new tab)
  • Jun 1, 2026
    Permit
    Plumbing Permit · In order to install two new customer provided 2500 gallon grease traps a 12 x 10 area of concrete will be removed. This area will be excavated up to 12 in depth. The new grease traps will be installed per manufacture requirements and inspected by the City of Austin. The system will be connected to the existing inlet and outlet piping. Once the new system is in use the existing trap will be pumped cleaned and filled in with pea gravel and topped with concrete.
    No product keyword matched · Austin issued construction permits
    Source record (opens in new tab)
  • May 21, 2026
    Permit
    Plumbing Permit · Replace 3/4 RPZ on back wall behind combi oven.
    No product keyword matched · Austin issued construction permits
    Source record (opens in new tab)
  • Apr 27, 2026
    Permit
    Plumbing Permit · Install new RPZ by the water heater for the syrup station
    No product keyword matched · Austin issued construction permits
    Source record (opens in new tab)
  • Mar 13, 2026
    Permit
    Plumbing Permit · Replace the RPZ for carbonator
    No product keyword matched · Austin issued construction permits
    Source record (opens in new tab)
  • Mar 12, 2026
    Permit
    Plumbing Permit · The 1 backflow for the chiller on the roof is damaged beyond repair. The assembly will be replaced with a new 1 watts 009QT.
    No product keyword matched · Austin issued construction permits
    Source record (opens in new tab)
  • Feb 26, 2026
    Permit
    Plumbing Permit · Install new RPZ for future water machine on right end of main bar by entrance under ice well on right end of bar.
    No product keyword matched · Austin issued construction permits
    Source record (opens in new tab)