Plumbing Permit · M.E. Plumbing will excavate an approximately 4 x 4 access area to the right of the front door and tunnel up to approximately 8 beneath the structure to access and repair the compromised building drain affected by root intrusion. The accessible damaged piping will be removed and replaced with Schedule 40 PVC pipe and fittings utilizing approved transition fittings and supports as required.
No product keyword matched · Austin issued construction permits