Plumbing Permit · Diagnostic revealed a broken 3 wye in the kitchen under the foundation.
There is also another broken 4 wye at the exterior beam for the 3 compartment sink drain.
Plan of action is to apply for a permit with the customers jurisdiction to legally and professional proceed with repairs. - Begin by prepping the interior of the kitchen with either plastic or cardboard to help protect from construction dust. Then we will utilize specialized equipment to create a direct access entry hole located at the doorway into the kitchen . Then we will tunnel remove the soil to expose the broken 3wye.
If additional tunneling or beam penetration is needed a supplemented estimated will be provided. - If any more work is needed such as solid rock removal roots or any unforeseeable objects come across this estimate will be supplemented to accommodate the time/material needed to complete the job. - Defective drains will be removed from plumbing system and debris will be hauled away. - Drains will then be replaced with new DWV schedule 40 PVC pipe and fittings in accordance to plumbing code.
Then we will dig down at the exterior to expose the 4 wye and perform repairs.
Plumbing Permit · Diagnostic revealed a broken 3 wye in the kitchen under the foundation.
There is also another broken 4 wye at the exterior beam for the 3 compartment sink drain.
Plan of action is to apply for a permit with the customers jurisdiction to legally and professional proceed with repairs. - Begin by prepping the interior of the kitchen with either plastic or cardboard to help protect from construction dust. Then we will utilize specialized equipment to create a direct access entry hole located at the doorway into the kitchen . Then we will tunnel remove the soil to expose the broken 3wye.
If additional tunneling or beam penetration is needed a supplemented estimated will be provided. - If any more work is needed such as solid rock removal roots or any unforeseeable objects come across this estimate will be supplemented to accommodate the time/material needed to complete the job. - Defective drains will be removed from plumbing system and debris will be hauled away. - Drains will then be replaced with new DWV schedule 40 PVC pipe and fittings in accordance to plumbing code.
Then we will dig down at the exterior to expose the 4 wye and perform repairs.
No product keyword matched · Austin issued construction permits
Plumbing Permit · - Diagnostic revealed a broken 4x2 wye for the mens restroom sinks.
The wye is located under the main hallway.
- Plan of action is to apply for a permit with the customers jurisdiction to legally and professional proceed with repairs.
- Begin by utilizing specialized equipment to create a direct access entry hole located in the hallway.
- This will expose noted diagnostic issues.
- If additional access is needed a supplemented estimated will be provided.
- If any more work is needed such as solid rock removal roots or any unforeseeable objects come across this estimate will be supplemented to accommodate the time/material needed to complete the job.
- Defective drains will be removed from plumbing system and debris will be hauled away.
- Drains will then be replaced with new DWV schedule 40 PVC pipe and fittings in accordance to plumbing code.
- After work is completed we will then perform a static test on all the drain system to ensure there are no further leaks.
- Plumbing outfitters is not responsible for any cosmetic repairs included but not limited to irrigation repairs necessary sheet rock repairs or landscaping repairs.
- Plumbing Outfitters is not responsible for damage to concealed water lines tension cable or rebar. These are considered unforeseen and cannot be avoided. All cautions will be taken to protect these areas.
- Foundation access will be inspected by an engineer to ensure foundation is sound after plumbing repair. Customer will be provided with an engineer certification letter. If Engineer determines additional or different materials are required for process of closing up the access hole this estimate will be supplemented to include necessary materials
- During the inspection process any requirements by inspector in order to close permit that was outside the original scope of this work is not included on this estimate.
- After city inspection passes a rough-concrete patch will be performed all aspects according to e
No product keyword matched · Austin issued construction permits
Plumbing Permit · Perform an air-pressure gas leak test by shutting down the gas supply and pressurizing the lines with air. Includes monitoring the system to help diagnose the source of gas leaks.
*Unit I
No product keyword matched · Austin issued construction permits
Plumbing Permit · Diagnostic revealed a leak on the tub drain for unit C and a belly on the main drain under unit C bathroom.
- Plan of action is to apply for a permit with the customers jurisdiction to legally and professionally proceed with repairs.
- Begin by excavating the entry hole at the back of the building outside of unit C.
- Then tunnel underneath the foundation of the building approximately 10 feet to access and expose noted diagnostic issues.
- If additional tunneling or beam penetration is needed a supplemented estimate will be provided.
- If any more work is needed such as solid rock removal roots or any unforeseeable objects come across this estimate will be supplemented to accommodate the additional work needed to complete the job.
- Defective drains will be removed from the plumbing system and debris will be hauled away. - Drains will then be replaced with new DWV schedule 40 PVC pipe and fittings in accordance with plumbing code.
- Pipe will be well supported and strapped to underneath foundation to prevent the same thing happening in the future.
- After work is completed we will then perform a static test on the entire drain system to ensure there are no further leaks. If additional leaks are found a separate estimate will be presented for the repair.
No product keyword matched · Austin issued construction permits
Plumbing Permit · Excavate and chip an access opening in the shop area located outside the womens restroom.
Tunnel approximately ten (10) linear feet beneath the structure to access the affected piping.
Remove and replace the existing 2-inch branch line.
Remove and replace a portion of the 4-inch main line as necessary.
Properly anchor and support all newly installed piping in accordance with applicable plumbing codes and industry standards.
No product keyword matched · Austin issued construction permits
Plumbing Permit · Diagnostic revealed a broken 4 combo under unit D exterior wall as the main sewer line exits the foundation. The broken drain affects three units.
- Plan of action is to apply for a permit with the customers jurisdiction to legally and professionally proceed with repairs.
- Begin by excavating the entry hole at the front of the building at the sewer cleanouts.
- Then tunnel underneath the foundation of the house approximately 5 feet to access and expose noted diagnostic issues.
- If additional tunneling or beam penetration is needed a supplemented estimate will be provided.
No product keyword matched · Austin issued construction permits