Electrical Permit · Austin Energy controlled power outage for safety purposes only.
TMC will be installing new equipment inside the existing water pump station and in order to complete this work in a safe and controlled environment the facility must be temporarily de-energized. Please note that no work will be performed on the existing Austin Energy service. All work will be limited to equipment located within the water pump station
We will be removing the existing 2500A switchboard and installing a new switchboard with the same amperage rating
No product keyword matched · Austin issued construction permits
Electrical Permit · Installation of Temporary Service utilizing existing AE transformer at Austin Water Facility located 7329 McNeil Dr.
*The service will be reconnected to power a construction trailer
No product keyword matched · Austin issued construction permits
Electrical Permit · Service for Hornsby Dewater Facility
* existing overhead Utility with a pole mounted transformer that is being replaced by an underground feed with a pad mounted transformer.
1200amp 277/480v CT service that is metered at the transformer.
No product keyword matched · Austin issued construction permits
Electrical Permit · Additional Electrical Service installation at Walnut Creek Wastewater Treatment Plant for construction activities. Austin Water is using the General Permit Clause for this electrical service.
No product keyword matched · Austin issued construction permits