Plumbing Permit · Remodel of restrooms on the first and second levels; new window openings in the existing exterior walls at weight room; new roof top skylights lighting and acoustical tiles at corridor north of competition gym
Plumbing Permit · Remodel of restrooms on the first and second levels; new window openings in the existing exterior walls at weight room; new roof top skylights lighting and acoustical tiles at corridor north of competition gym
No product keyword matched · Austin issued construction permits
Plumbing Permit · We are to make a 4x4 around external clean outs in front left corner of the building dig down to the pipe and tunnel under the building 25 to repair belly in the line. This includes saw cutting and chipping concrete around the clean outs. We will also need to remove mop sink and saw cut and chip and dig down to expose the p-trap on the mop sink and floor drain to replace p-trap will perform camera inspection of pipes after p-traps to ensure no debris further in the line. After p-traps are replaced we will have rough pour back of concrete and reinstall mop sink and floor drain.
No product keyword matched · Austin issued construction permits
Plumbing Permit · We will perform a spot repair to the existing sewer line at the specific location of the damaged section. The work will consist of excavating down to the sewer line and removing and replacing only the affected portion of piping rather than a full or extended replacement. The new sewer pipe will be properly sized and installed with the correct pitch to ensure proper drainage and reliable performance. All fittings and connections will be securely assembled and sealed. Once installation is complete the repaired section will be tested to verify proper flow and confirm there are no leaks prior to backfilling.
No product keyword matched · Austin issued construction permits
Plumbing Permit · Enclosure of existing roofed areas to become AC space
* A jurisdictional error occurred by myself in haste I made an oversight and did not catch it is in the ETJ. I should not have processed this project. Measures have been taken to ensure this kind of oversight does not happen in the future* P.H.
No product keyword matched · Austin issued construction permits
Plumbing Permit · Replacement of an existing water heater Replacement of an existing water heater We are to replace 2 100 gallon water heaters with equivalent-capacity water heaters. They are both located on the same building used for all the units within that building.
Units 1-11 are supported with these two units
No product keyword matched · Austin issued construction permits