Mechanical Systems · FILING HEREWITH MECHANICAL WORK FOR THE BUILDING AT THE ADDRESS LISTED. INCLUDES NEW VRF SYSTEM, KITCHEN, TOILET & LAUNDRY EXHAUST SYSTEMS.
No product keyword matched · NYC DOB building permits
General Construction · Conversion of an existing two-family townhouse into a single-family residence. Proposed work includes the interior renovation and reconfiguration of existing spaces, including the installation of new non-load-bearing partitions ceilings, and floors.
No product keyword matched · NYC DOB building permits
Structural · STRUCTURAL & FOUNDATION DETAILS IN CONJUNCTION WITH INITIAL ALTERATION #B01151456-I1. LOWER PARTIAL SLAB IN CELLAR, LOWER PART OF FRONT AREAWAY, REPLACE DECK AT 1ST FLOOR. ENLARGE OPENING AT REAR OF CELLAR AND MISC FRAMING.
No product keyword matched · NYC DOB building permits
General Construction · NEW CONVENIENCE STAIR BETWEEN THE 3RD & 4TH FLOORS IN EXISTING DUPLEX APARTMENT. UNITS PREVIOUSLY COMBINED UNDER APPLICATION #121425289. NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS.
No product keyword matched · NYC DOB building permits
General Construction · Conversion of an existing two-family townhouse into a single-family residence. Proposed work includes the interior renovation and reconfiguration of existing spaces, including the installation of new non-load-bearing partitions ceilings, and floors.
No product keyword matched · NYC DOB building permits
Structural · TRIPLEX 2N RENOVATIONS ON 1ST&2ND FL ONLY. SCOPE: SISTERING OF EXIST. JOISTS AND INSTALLATION OF NEW LVL HEADER FOR NEW STAIR OPENING AND INFILL OF EXIST. STAIR OPENING. NEW STEEL LINTEL SUPPORTED BY NEW STEEL POSTS FOR ENLARGED OPENING IN EXTERIOR WALL.
No product keyword matched · NYC DOB building permits
General Construction · Herewith, please find the filing for interior demolition, which includes the removal of partitions, ceilings, floors, and fixtures throughout. There will be no changes to use, egress, or occupancy.
No product keyword matched · NYC DOB building permits