Plumbing · PLUMBING WORK FILED IN CONJUNCTION WITH RENOVATION OF APARTMENT #15A. REPLACE FIXTURES IN POWDER ROOM AND ONE BATHROOM, RELOCATE FIXTURES IN MASTER BATHROOM AND KITCHEN AND INSTALL NEW LAUNDRY FIXTURES. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
No product keyword matched · NYC DOB building permits
General Construction · PARTIAL RENOVATION TO EX. APT. AT THE 15TH FL. DEMOLISH AND CONSTRUCT NON-STRUCTURAL PARTITIONS, FIXTURES AND FINISHES. REPLACE WINDOWS & EXT. DOORS IN EX. OPENINGS. MINOR REPAIR AND PATCHING WORK AT TERRACE PARAPET WALL, NEW FLOORING AT GREENHOUSE
No product keyword matched · NYC DOB building permits
Mechanical Systems · MECHANICAL WORK FILED IN CONJUNCTION WITH RENOVATION OF EX. APT #15A. REMOVE EXISTING NEW FAN COIL UNITS AND REPLACE WITH NEW, CONNECTING TO EXISTING BUILDING HW/CW PIPING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
No product keyword matched · NYC DOB building permits
General Construction · Renovation of an existing apartment# 3E on the third floor. Work to include non-structural demolition and general construction as per plans filed herewith. No change change to use, egress or occupancy.
No product keyword matched · NYC DOB building permits
General Construction · Removal and installation of non load bearing partitions, fixtures and finishes and renovation of kitchen and bathrooms in Unit 12 AE.
No product keyword matched · NYC DOB building permits
Mechanical Systems · Modification of mechanical system in existing apartments #12A and #12C, as per plans filed herewith. No change in use, egress, or occupancy.
No product keyword matched · NYC DOB building permits
General Construction · Interior renovation and combination of existing apartments #12A and #12C, as per plans filed herewith. No change in use, egress, or occupancy. Apartments 12A and 12C combination conforming with TPPN # 3/97.
No product keyword matched · NYC DOB building permits
Sidewalk Shed · HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
No product keyword matched · NYC DOB building permits
Sidewalk Shed · HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
No product keyword matched · NYC DOB building permits
General Construction · Facade restoration to repair and address unsafe FISP conditions as per plans filed herewith. No change in use, egress or occupancy.
No product keyword matched · NYC DOB building permits
General Construction · Facade restoration repairs to address 9th cycle unsafe conditions as per plans filed herewith. No change in use, egress or occupancy.
No product keyword matched · NYC DOB building permits
Mechanical Systems · Modification of mechanical system in existing apartments #12A and #12C, as per plans filed herewith. No change in use, egress, or occupancy.
No product keyword matched · NYC DOB building permits
General Construction · Interior renovation and combination of existing apartments #12A and #12C, as per plans filed herewith. No change in use, egress, or occupancy. Apartments 12A and 12C combination conforming with TPPN # 3/97.
No product keyword matched · NYC DOB building permits